My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12512 (2)
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12512 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:18:15 PM
Creation date
10/18/2007 8:22:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8155.910.A
Description
Pueblo RICD - Hearing
State
CO
Basin
Arkansas
Water Division
2
Date
7/23/2002
Author
Objectors to Case
Title
Consolidated Powerpoint Presentation by Objectors
Water Supply Pro - Doc Type
Data
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br /> <br />Water Resource Investigations <br />for RFDSG and Aurora <br /> <br />· Comparison of proposed RICO flowrates <br />with simulated future river flow levels. <br />· RICO curtailment of transferable yield of <br />representative downstream water right <br />· Remaining transferable yield of major <br />irrigation systems downstream of RICO <br /> <br />Simulation of Future River <br />Flows <br /> <br />· Changing river environment (Le., irrigation <br />rights, municipal use) dictates a river model <br />· PSOP model scenario employed: <br />- 2040 demands <br />- 1966-1995 hydrology <br />- PBWW Diversions at Pueblo Reservoir <br />- PSOP re-ops and enlargement in place <br />· Conclusion: proposed RICO flowrates not <br />consistent with future average river flows in <br />shoulder periods <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.