My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10481
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10481
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:13:01 AM
Creation date
10/17/2007 2:58:55 PM
Metadata
Fields
Template:
Floodplain Documents
County
Douglas
Basin
South Platte
Title
Chatfield Reallocation Study - Roadway Analysis Study
Date
5/11/2004
Prepared For
CWCB
Prepared By
Sear Brown
Floodplain - Doc Type
Floodplain Report/Masterplan
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />most of them will be removed from under water. Time will need to be <br />construction schedule to dry the materials to a moisture content <br />compacting into the embankment. <br /> <br />wet because <br />provided in a <br />acceptable for <br /> <br />I <br /> <br />BridQes, Three bridge sites were looked at. One of the sites is across Deer <br />Creek and the other two are across the South Platte River. One of the sites across the <br />South Platte River is the site of an existing bridge, We observed no geologic or <br />geotechnical reasons the construction or reconstructions of bridges at these sites are <br />not feasible, <br /> <br />I <br /> <br />I <br /> <br />The ground under the abutments of the Deer Creek site is different. Our <br />observations suggest the foundation strata for the east or left (looking downstream) <br />abutment of the Deer Creek Bridge is expansive clay overlying expansive claystone. <br />Our observations suggest the foundation strata for the right abutment is several feet of <br />clays overlying sands, gravels and cobbles. Our experience in the area shows the <br />sands, gravels and cobbles are underlain by claystone at varying depths, We expect <br />ground water at about the elevation of Deer Creek will be found under the right <br />abutment and little or no ground water will be found in the clays or claystones under the <br />left abutment. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />We believe straight-shaft piers penetrating the claystone will be the better <br />foundation for the left bridge abutment due to the expansive clays and claystones, <br />Footings bearing on the sands, gravels and cobbles, straight-shaft piers penetrating the <br />claystone if it is not too deep or friction piling driven into the sands, gravels and cobbles <br />or end-bearing piling driven to "practical refusal" in the claystone are alternatives for the <br />right abutment. However, the larger cobbles and perhaps boulders in the sand, gravel <br />and cobble stratum may interfere with drilling pier holes or driving piling, Pier holes will <br />need to be cased due to the ground water, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />The existing bridge across the South Platte River appears to have performed <br />satisfactorily, from the foundation point-of-view, We do not know how the existing bridge <br />is founded, but suggest this be learned, Because the existing bridge foundation appears <br />to have performed acceptably, we believe it is reasonable to assume at this stage in the <br />project planning that the abutments of either of the proposed new bridges across the <br />South Platte River can be founded with the same type foundation used to found the <br />existing bridge. The alternatives discussed above for the right abutment of the Deer <br />Creek Bridge are also alternatives for the abutments of the new bridge across the South <br />Platte River. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />We believe that at a time not too distant in the future, if the Reallocation Study <br />progress to design, borings will need to be drilled along the new roadway alignment and <br />at the selected bridge locations, some laboratory tests will be needed and geotechnical <br />engineering will need to be done to confirm our observations, opinions and conclusions <br />discussed above. We would be pleased to provide these services to the project team at <br />that time, <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />4 <br /> <br />SEAR.BROWN <br />CHATFIELD RESERVOIR REALLOCATION STUDY <br />'ROADWA Y ANALYSIS STUDY. <br />CTL I T JOB NO. FC.2998 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.