<br />"'t,. <br /> <br />"' <br /> <br />Mr. Tom Browning <br />Page 2 <br /> <br />the field survey and map check for the project. We are also assuming that there are <br />adequate control points close to the bridge crossings so they can easily be tied together <br />with GPS. <br /> <br />Based on your Scope of Services, ICON will complete the following tasks: <br /> <br />1. Research and Data Collection: Obtain information for the project from the <br />CWCB including FEMA maps and reports, digital mapping, benchmarks and field <br />control, names and addresses of potential contacts and any other hydrologic or <br />hydraulic data available. <br /> <br />2. Map Check: ICON will complete GPS field surveys to obtain elevation data at <br />several points in the vicinity of the bridges that are accessible to our survey crew, <br />Field control used for the aerial mapping will be obtained from the CWCB and <br />used as the horizontal and vertical control for the map check. The elevation data <br />will be analyzed and the points compared to the digital mapping developed for the <br />project. A determination of the mapping accuracy will be made based on the: two <br />sets of data. <br /> <br />3. Field Bridge Measurements: There are four bridges that cross the Crystal River <br />within the project study reach. Field measurements will be taken that includl~ the <br />following parameters: <br /> <br />a. Bridge length <br />b. Bridge height (water to low chord) <br />c. Deck thickness (low chord to top of road) <br />d. Pier location, width, and shape (if applicable) <br />e. Bridge width <br />f. Digital photos of both the upstream and downstream face of the structure <br />g. Estimation of water depth (measured if possible) <br /> <br />If field control is near the bridge locations, a top of road elevation will be <br />obtained at each end of the structure. If field elevations cannot be obtained, the <br />top of road elevations will be estimated from the digital mapping. This will serve <br />as the basis for determining elevations for the HEC-RAS modeling. <br /> <br />As mentioned previously, the upstream bridge is on gated, private property and <br />cannot presently be accessed. We are assuming the CWCB or County will obtain <br />access for us at the time of our site visit. If not, we will model that area without a <br />bridge in place. <br /> <br />4. Hydrologic Evaluation: We will complete a Flood Flow Frequency Analysis for <br />the Crystal River utilizing existing stream gage records at Marble, Redstone, and <br />above Avalanche Creek. Flood flows will be developed using a Log-Pearson <br />Type III frequency distribution. Flows will be developed for the 10-, 50-, 100-, <br />and 500-year events. <br />