Laserfiche WebLink
<br />.E~ <br /> <br />I <br />810Q 50Lth f'Kronstreet:. Suite 300, Erolewood. CO BOle - Alone (303)ccI-OBOC / Felx (303)ccI-4OI9 <br />i <br /> <br />Memorandum <br /> <br />TO: <br /> <br />I <br />Tom Browning, CWCB <br /> <br />Penn Gilderbleev&..... <br />I ~~ <br />March 25, 2004 <br />I <br />I <br />I <br />Work Completed on the Crystal River Floodplain Study as of March 25,2004 <br /> <br />I <br /> <br />ICON Invoice number 4971 <br />CWCB contract reference number 02 PDA 00060 <br />I <br />I <br />The following is a list of work completed on the Crystal River Floodplain Study in accordance with our <br />Project Estimating Sheet as 6f March 25,2004: <br /> <br />FROM: <br /> <br />DATE: <br /> <br />RE: <br /> <br />Task <br /> <br />% Complete <br />100% <br /> <br />100% <br /> <br />100% <br /> <br />90% <br /> <br />50% <br /> <br />0% <br /> <br />. <br /> <br />I <br />Field Review/Research and Data Collection <br />Map Check/Field Bhdge Measurements <br />Hydrologic Evaluation <br />Hydraulic Analysis: <br />CWCB Report Preparation <br />, <br /> <br />FEMA Specifications <br /> <br />e <br /> <br />~ <br />\ <br />