Laserfiche WebLink
<br />Browning, Tom <br /> <br />From: <br />Sent: <br />To: <br />Subject: <br /> <br />Hyde, Brian <br />Monday, April 28, 2003 1 :30 PM <br />Browning, Tom <br />Crystal River information <br /> <br />Tom: <br /> <br />I spoke with Neal Starkebaum again regarding the Crystal River study, The reach length is 4 to 4.5 miles. The upstream <br />study limit is the confluence with Lost Trail Creek (upstream of the Town of Marble). The downstream study limit is the <br />Gunnison County Road 3 bridge downstream of the Town of Marble, at the US Forest Service boundary, at Ute Meadows. <br />There is a gap from there downstream to the Pitkin/Gunnison County line, where our old Pitkin County study picks up <br />detailed mapping on toward Redstone and Carbondale. <br /> <br />I think all of your questions have now been answered. Let me know what else you may need, and let me know the <br />schedule for the meeting with Icon. <br /> <br />Brian <br /> <br />1 <br />