Laserfiche WebLink
<br />PREPARED BY, RPG Dept, Professional Professional Enaineer Enaineer Cadd Admin Survey Project Survey Misc. <br />CHECKED BY: DJW Manaoer Enoineer III Enoineer I II I Desicner Mananer Surveyor Crew Oired <br />DATE: JUNE 25. 2003 $125 $110 $95 $80 $68 $89 $45 $92 $65 $115 Costs <br /> DescriDtion Hours Hours Hours Hours Hours Hours Hours Hours Hours TOTAlS <br />FIELD REVIEW I RESEARCH AND DATA COLLECTION 10 10 16 2 $50 $4 058 <br />MAP CHECK I FIELD BRIDGE MEASUREMENTS 2 8 4 6 6 20 $1200 $5 796 <br />HYDROLOGIC EVALUATION 4 16 8 $50 $2710 <br />HYDRAUUC ANALYSIS FLOODPLAIN 4 24 60 8 $200 $8 332 <br />HYDRAUUC ANALYSIS l-FOOT RISE FLOODWA Y 1 8 16 $50 $2215 <br />FLOODPLAIN & FLOODWAY DEUNEATlON /11"Xl7'" PLAN SHEETS <!ill"=200') 2 16 32 32 $200 $6 738 <br />PREPARE FLOOD PROFILES '11"Xl7'" SHEETS AT 1" = 200') 1 6 12 8 $50 $2 257 <br />PREPARE DIGITAL FLOODPLAIN MAPS 4 16 8 8 $200 $3412 <br />REPORT PREPARATION 4 40 8 12 $50 $5 442 <br />REVISIONS BASED ON REVIEW COMMENTS 2 8 8 4 4 $50 $2156 <br />MEETINGS WITH CWCB I COORDINATION 8 16 4 4 $150 $3 266 <br />MEETING WITH GUNNISON COUNlY 12 12 2 2 $325 $3 263 <br />PUBUC MEETING AT MARBLE 16 16 2 2 $500 $4318 <br />DEUVERABLES 1 4 2 2 2 $144 $1 037 <br /> TOTAL HOURS 71 10 206 158 0 86 18 6 0 20 $55,000 <br /> TOTAL COS $8 875 $1100 $19 570 $12640 $0 $5 934 $810 $552 $0 $2 300 $3219 $55,000 <br /> <br />Oysc.I~FlaodpIain <br /> <br />-, <br />