My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10473
CWCB
>
Floodplain Documents
>
DayForward
>
1
>
FLOOD10473
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 10:12:59 AM
Creation date
10/11/2007 4:07:33 PM
Metadata
Fields
Template:
Floodplain Documents
County
Gunnison
Stream Name
Crystal River
Basin
Gunnison
Title
Crystal River Study Correspondence
Date
6/25/2004
Floodplain - Doc Type
Correspondence
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1, <br /> <br />'- <br /> <br />Mr. Tom Browning <br />Page 4 <br /> <br />file format. GIS maps and project files shall be included on each <br />CD. <br />d. One hard copy of a bound Technical Addendum (8.5"xll" fOImat <br />with index and cover approved by CWCB). <br />9. Cost Estimate: Attached is a manpower estimate to complete the tasks as outlined <br />above. The total estimated cost to complete the study is $55,000. <br /> <br />We are available to start the field work on this project once given notice to proceed. <br />If you have any questions, please contact us at your convenience. <br /> <br />Sincerely, <br />ICON Engineering, Inc. <br /> <br />~~ <br /> <br />Penn Gildersleeve, P.E. <br />Principal <br /> <br />PG:km <br /> <br />Enclosure <br />
The URL can be used to link to this page
Your browser does not support the video tag.