Laserfiche WebLink
<br />~ <br /> <br />ENG I NEER I NG, I NC 8IC)() 5OO:h f'Kron street:. Suite:300, Erolewood. CO BOle - Alone (:K)3) cCl-08OC / Fa){ (:K)3)cCl-4OI9 <br /> <br />Memorandum <br /> <br />TO: <br />FROM: <br />DATE: <br />RE: <br /> <br />i <br />I <br />Tom Browning, CWCB <br /> <br />Penn Gilder~leeve <O~ <br /> <br />June 25, 2004 <br />I <br /> <br />Work Com~leted on the Crystal River Floodplain Study as of June 25,2004 <br /> <br />ICON lnvoibe number 5075 <br /> <br />I <br />CWCB contract reference number C153986 / Routing number 02 PDA 00060 <br />I <br />I <br />I <br /> <br />The following is a list of work completed on the Crystal River Floodplain Study in accordance with our <br />Project Estimating Sheet as qf June 25, 2004: <br /> <br />i <br />Map Check/Field Bridge Measurements <br /> <br />Hydrologic Evaluation <br /> <br />Hydraulic Analysis <br />! <br />Floodplain/FloodwflY Delineation <br /> <br />Flood Profiles <br /> <br />Digital Mapping I <br /> <br />CWCB Report Preparation <br /> <br />FEMA Specificatiqns <br />I <br />Meeting Coordination <br />I <br />i <br /> <br />% Complete <br />100% <br />100% <br />100% <br />100% <br />100% <br />100% <br />100% <br />100% <br />100% <br />100% <br /> <br />Task <br />Field Review/Research and Data Collection <br /> <br />This project is complete barring any changes in response to your comments on the report. <br />