<br />...
<br />
<br />t
<br />
<br />, .
<br />Roaring Fork River Trail and Whitewater Course, City of Aspen, Colorado, 1990-1992:
<br />Provided pl~g and design services, including site planning, and design, environmental
<br />restoration and resomce protections. Provided cost estim8.tes, bid docmnents, and construction
<br />supervision. Also elicited public input, secured local funding, and obtained approvals from
<br />local, State and federal officials. .
<br />Glenwood Springs Roaring Fork River Trail; CitY of Glen wood Springs, 'Colorado, 1992:
<br />Completed design and construction services for a major Colorado River bike/pedestrian bridge,
<br />railroad underpass, and connecting trails.
<br />
<br />Glenwood Springs River Corridor Master Plan and Design Guidelines, City of Glenwood .
<br />Springs, Colorado, 1991: Completed a River Corridor Mastel: Plan for the Roaring Fork and .
<br />Colorado Rivers through the City. This pIau, approved by the City Council, was _ to the
<br />citizens for approval of funds for ~s major project.. Design and constructio~ of a deJnonstration
<br />trail in 1991 was also'included. ' ,
<br />
<br />". .
<br />Yampa River Trail, City of Steamlx?at Springs, Colorado, 1989 - 1991: Completed a master piau
<br />fO.!Jhe Yampa River Corridor for'the City of Steamboat Springs. After the successful passage of
<br />a $2 million bond initiati~e, Recreation Engineering & PlliDning was retained to design and
<br />implement this major trailIconidor project. Completion of a Chy-wi~ master traiJ system plan
<br />was also part of the overall project. Major portions of the Yampa River Trail were built in 1990
<br />with the remainder constructed in 1991. Also designed and supemsed construction of fish
<br />ha~itat and boating improvements in the Yampa River, within the Cite. '
<br />
<br />Boulder Creek Whitewater Course, City"ofBOulder" i990: Obtained a gnuit from the Cite of
<br />Boulder Parks Department to construct a whitewater kayak course on Boulder Creek. The ,
<br />project included reconstruction of a 1/4 mile section of the" Creek to create a series of small ~ps
<br />and pools that allows boating at very low flows. The project also included construction of 25
<br />semi-permanent slalom gates. .~e course was built on schedule and is the .Iocation for many
<br />m~jor whitewater events.
<br />
<br />St. Vrain River Restoration, Town of Lyons, 1989-1990: Obtained a major grant to restore a
<br />segment of the South St. V~ River, including stream habitat improvements, a pedestrian trail,
<br />bridge, and pocket parks. . The project was completed on schedule and within budget and is
<br />currently enjoyed by hundreds of people each year.
<br />
<br />Two Forks River Park, Deckers, Colorado, 1989: Development of a major regional park withiD
<br />the proposed Two Forks Reservoir area. Presen~ to many federal, State, and local a,gencies.
<br />
<br />Clear Creek Master Plan, City of Golden, 1987: Master development plan for the two mile Clear
<br />Creek Corridor as it passes through academic, residential, urban and industrial areas 'of '
<br />, downtown Golden. Trail, in-channel, public facility, and park improvements have become part
<br />of the revitalized area of the Creek. " ' " .
<br />
<br />-19-
<br />
<br />
|