Laserfiche WebLink
<br />. .' <br /> <br /><' <br /> <br />Appendix 2. List of Completed Projects <br /> <br />List of Completed ProJ~cts <br /> <br />Gunnison River Whitewater Parle, 'Gunnison, Colorado, 1m-Present: Chiefplanner, designer, <br />arid engineer for this $200,000 river park. The project included state-of-the-art whitewmer <br />improvements, stream bank restoration and access, and overaII site improvements, The first <br />p~ of this project was completed in the FaIl of2~. <br /> <br />. . <br />Colorado River Wbi~water Park Conceptual Plan, Glenwood Springs, Colorado. 2002-~t: <br />Chief planner, designer, and.engineer for this project.' Design has been approved an.construction <br />is expected to begin in the near, futw-e.. " . ' :, " _ . . <br /> <br />J' <br /> <br />. , <br />Arkansas River Wbitewater Park, 'Salida, Colorado, 1~-Present: Chiefplanner, designer, and <br />engineer of a plan :funded by the Arkansas"River Trust. Natural-appearing whiteWater <br />improvements restore the river, and provide economic and recreational benefits to the downtown <br />area. A key aspect of the project includes whitewater course improvements at the site of the <br />longest-running whitewater .kayak race in North America, FibArk., <br /> <br />. , . <br />Gore Creek Whitewater Park, Vail, Colorado, 1999-Present: Chiefplanner, designer, and <br />engineer for this $200,000 river park. TJte project, which is located in the pedestrian village in <br />downtown Vail, included creative park and bank improvements and featured natural boulder' , <br />drop structures. ' , <br /> <br />.TruckeeRiverWhitewaterPark, Reno, Nevada, 1999-2000: Chief planner, desiper,'and . <br />engineer of a plari funded by the Nevada Commission on Tourism to reswre and integrate the <br />Truckee River into the urban fabric of downtown Reno. Key aspects o(the project include a <br />' whitewater slalom COlJrSe and riverside trails, plazas, and' esplanades which mesh with in-stream <br />improvements and adjacent commercial activity. ' <br /> <br />Animas River Whitewater Improvements Project, Farmington, New Mexico, I 9~-2000: Chief <br />planner, designer, and engineer for this $100,000 project, which included modificatioB of an <br />unsigbtly diversion structure made of dumped concrete and rubble. The river restoration <br />included the diversion of water using na~ly appearing features, which provide in-stream <br />habitat for endangered fish species. <br /> <br />, Conceptual Plans, Colorado River Whitewater Par~ Grand ]WJction, Colorado, 1999: Chief <br />planner and designer for w~tewatei park sites in the Grand Valley on the Colorado J.ljver. Work <br /> <br />-17- <br /> <br />