Laserfiche WebLink
<br />Suggestions for considerations <br /> <br />· More wells divert as alternate points. <br />· Use say 2.5 million ac-ft of G.W. aquifer storage <br />as a managed resource <br />· Consider Bittinger alternative suggestions <br />· Need agency to manage to achieve maximum <br />utilization objective <br />· Need to use ground water reservoir for storage. <br />· Reduce litigation costs. <br />· All water right owners to come to negotiating <br />table. <br />· Need everyone to think "outside the box". <br />