My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CCPWesternRenewableEnergyWaterProductivityMultiplier
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
CCPWesternRenewableEnergyWaterProductivityMultiplier
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:36 PM
Creation date
10/5/2007 2:31:49 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8420.500
Description
South Platte River Basin Task Force
State
CO
Basin
South Platte
Date
4/19/2007
Author
Dave Miller
Title
White Paper Presented to SPTF
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PATENT PENDING <br />SYSTEM AND METHOD FOR SELECTIVELY DIVERTING WATER AND <br />PROVIDING PEAK HYDROELECTRIC POWER <br />(NEPA) requires objective economic and enviro nmental comparisons of all reasonable <br />alternatives. Preliminary quantification of CCP’s unique regional energy and water <br />multiplier values will greatly simplify NEPA scoping comparisons with those other non - <br />integrated local alternatives, currently being co nsidered. <br />CONCLUSION <br />CCP’s innovative high - altitude pumped - storage concept can substantially increase the <br />productivity and quality of finite renewable Western energy and water resources <br />throughout the new millennium. Western consumers and environments will realize <br />unprecedented benefits from CCP. Historically competing stakeholders now have strong <br />economic and environmental incentives, to unite behind emergency development of <br />Central Colorado Project for current and future generations. Union Park is the world’s only <br />headwater conservation site that can provide epic enhancements for natural and human <br />needs throughout five arid and semi - arid river basins. <br />References to Professional Papers and Reports: <br />[1] Feasibility Level Geological and Geotechnical I nvestigation for Union Park Dam by Horst Ueblacker, P.E., <br />st <br /> UEBLACKER ASSOCIATES ( www.ueblacker.us ): Proceedings 41 U.S. Symposium on Rock Mechanics, Paper <br /> ARMA/USRMS 06 - 960, June 17 - 21, 2006, Golden, Colorado, 28 pages, 30 references; <br />[2] Fea sibility Study and Preliminary Design of Union Park Dam by Horst Ueblacker, P.E., UEBLACKER ASSOCIATES <br /> ( www.ueblacker.us ): Proceedings 26th United States Society on Dams (USSD) Annual Meeting and Conference, May <br /> 1 - 5, 2006, San Antonio, Texas, 3 2 pages, 29 references; <br />[3] Safety Evaluation of Existing Dams Analysis Summary (SEED Analysis Summary) TAYLOR PARK DAM. Prepared <br /> by Becky Morfitt, Lead Branch Coordinator, U.S. Department of the Interior Bureau of Reclamation, Denver, Colorado, <br /> November 27, 1989, (Library Document TC 557.C6 T39s 1999); <br />[4] Report of Findings of the Issue Evaluation, TAYLOR PARK DAM Uncompahgre Project. U.S. Department of the <br /> Interior Bureau of Reclamation Technical Service Center, Denver, Colorado: Te chnical Memorandum No. TL - 8312 - 4, <br /> March 2002 (Library Document TC 557.C6 T39 M35 2002); <br />[5] PUEBLO DAM – RISK ANALYSIS Modified Dam Including Contraction Joint Leakage and Concrete Dam Tension <br /> Issues. Prepared by Mark Steers and John Trojanows ki, U.S. Department of the Interior Bureau of Reclamation <br /> Technical Service Center, Denver, Colorado, July 2000. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.