My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
19A
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
19A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:36:49 PM
Creation date
9/28/2007 12:00:12 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/18/2007
Description
CF Section - Revisions to Existing Loans - New Cache La Poudre Irrigation Company - New Reservoir Construction
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The NCLPIC manages water in the Greeley NO.2 Ditch, delivering approximately <br />37,500 acre-feet per year. The ditch level fluctuates throughout the irrigation season making it <br />difficult and inefficient to serve all of the users, particularly those near the end of the system. In <br />order to overcome fluctuations in the ditch, NCLPIC must mn extra water to ensure that users at <br />the end of the system are not shorted. In addition, the NCLPIC estimates that it is approximately <br />10,000 ac-ft short of its current annual water requests, due to operational losses as well as the <br />transfer of Colorado Big Thompson water out of the system. The intent of this proj ect was to <br />construct three reservoirs near Barnesville to equalize ditch flows, improve system efficiency <br />(approx. 2,000 AF/year), and provide additional storage (approx. 2,500 AF/year) to meet <br />demand. The proposed reservoirs will also provide a benefit to the comprehensive groundwater <br />augmentation plan that the company is developing. <br /> <br />FEASIBILITY STUDIES <br /> <br />Smith Geotechnical Engineering Consultants of Fort Collins completed the feasibility <br />study in accordance with CWCB guidelines. The study included an assessment of alternatives to <br />address storage and operational deficiencies. <br /> <br />Table 1 below is a brief summary of the maj or proj ect elements selected and their <br />estimated cost, as presented in the original feasibility study: <br /> <br />Table 1. Opinion of Cost <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Dru Reservoir <br />2. Cornish Plains Reservoir <br />3. Barnesville E ualizer Reservoir <br />4. Jack Wells Pum in Station & Pi eline <br />5. Pro e Ac uisition <br />Total: <br /> <br />$2,217,000 <br />$2,350,000 <br />$922,000 <br />$1,632,000 <br />$2,421,000 <br />$9,542,000 <br /> <br />DISCUSSION <br /> <br />The NCLPIC has completed all the items identified above, with the exception of Dmry <br />Reservoir. The NCLPIC does not plan on pursuing the design and construction of Dmry <br />Reservoir at this time. The original storage volume of Cornish Reservoir was estimated at 1,600 <br />acre-feet, but was increased to 3,000 acre-feet during constmction. The increased storage <br />volume achieved in Cornish Reservoir eliminated the immediate need to construct the 600 acre- <br />foot Dmry Reservoir. <br /> <br />The land necessary to construct both Drury and Cornish Reservoir was purchased in 2003 <br />under a separate loan contract between NCLPIC and Cornish Plains Livestock, LLP for <br />$1,409,649, with a 20-year amortization, an annual payment of $122,843, and a 10-year balloon <br />payment of approximately $1,030,000. The purchase price of the land and accrued interest was <br />included in the overall cost of the project, as indicated above in Table 1. When the project was <br />presented to the Board in November of 2003, staff recommended a maximum loan amount of <br />$7,200,000, which was 75% of the total project cost of $9,542,000. The purchase of the land <br />was included the 25% cost participation from NCLPIC. <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.