Laserfiche WebLink
<br />GOAL 3: Continued <br /> <br />Promote regional intergovernmental cooperation <br />concerning watershed-based planning and <br />floodplain management using a strategic planning <br />process with goals and recommendations. <br /> <br />Improve access to information regarding <br />floodplain management flood hazard mitigation <br />and flood insurance through approaches such as <br />the use of hyper-links between state agency <br />websites, bibliographies of available materials, <br />etc. <br /> <br />Develop a hazard mitigation education program <br />for public of1icials at annual conferences and <br />workshops conducted by Colorado Association of <br />Stormwater and Floodplain Managers (CASFM), <br />Colorado Municipal League (CML), Colorado <br />Counties Inc. (CCI), the Colorado Emergency <br />Management Association (CEMA), the American <br />Planning Association (APA), and the American <br />Public Works Association (APW A) <br /> <br />Through flood hazard reduction workshops, <br />promote the use of a "hazardlwerlay" concept for <br />GIS mapping using information developed by the <br />Colorado Geological Survey (CGS) for Garfield <br />County as a model. <br /> <br />Promote public education on wildfire mitigation <br />to reduce flood hazard potential in post-burn <br />areas. <br /> <br />Provide newsletter articles, other relevant <br />information on flood hazard mitigation and other <br />forms of information exchange to professional <br />organizations and local governments. <br /> <br />Develop a flood hazard awareness and education <br />Program utilizing programs already in place. <br /> <br />Promote the concept of people accepting fiscal <br />responsibility for the consequences of living in <br />flood prone areas. <br /> <br />CWCR <br />DEM <br />DWR <br /> <br />CWCR <br />DEM <br />DWR <br /> <br />DNR <br />COOT DEM <br /> <br />CGS <br />CWCR <br />OEM <br /> <br />CWCR <br /> <br />DEM, CSFS, local <br />partners, RMIIA <br /> <br />DEM <br />CWCR <br /> <br />DEM <br />CWCR <br /> <br />DEM, CWCR <br />DNR <br />DOLA <br /> <br />Contact local governments and <br />determine level of interest <br /> <br />Gather informational materials <br /> <br />Set schedule to deliver strategic <br /> <br />Ongoing <br /> <br />Post two public notices every March <br />Establish webmaster duties <br /> <br />Assign duties <br /> <br />Establish webmaster duties <br /> <br />Assign duties <br /> <br />Gather information materials <br /> <br />Annual DEM training workshops for <br />local of1icials and annual emergency <br />management conference include hazard <br />mitigation components <br /> <br />Conduct statewide workshops <br /> <br />Conduct workshops on State Floodplain <br />and Criteria Manual <br /> <br />Gather informational materials <br /> <br />Publish articles in newsletters and <br />releases <br /> <br />Annual wildfire and mitigation <br />conference, partnership on public <br />information brochures and campaigns, <br />wildfire and lightning awareness weeks <br />Obtain agencies/entities PIO <br />information, Preparedness newsletter <br />articles from DEM <br /> <br />Conduct workshops and provide <br />educational materials <br /> <br />Provide education materials to local <br />governments and the public. <br /> <br />51 <br />