<br />a 1% origination fee), at its present interest rate of 2.5 % for 30-years. Security for the loan will be a pledge <br />of assessment revenues backed by assessment covenant and the project itself, to include the Lake Lee Dam, <br />the Big Windsor check and inlet stmcture, and the Finley check stmcture. Security for the loan will be <br />collateral in compliance with CWCB Loan Policy NO.5 (Collateral). <br /> <br />Staff further recommends that final approval of the loan be conditioned upon all standard-contracting <br />provisions of the CWCB. <br /> <br />cc: Barry Anderson, President, Larimer and Weld Irrigation Company <br />Duane Smith, Smith Geotechnical Engineering Consultants <br />Vaughn McWilliams, CWCB <br />Amy Stengel, AGO <br /> <br />4 <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conseryation Planning <br />