My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CA3
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
CA3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:38:56 PM
Creation date
9/28/2007 10:18:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/18/2007
Description
CF Section - Changes to Existing Loans - Larimer and Weld Irrigation Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />a 1% origination fee), at its present interest rate of 2.5 % for 30-years. Security for the loan will be a pledge <br />of assessment revenues backed by assessment covenant and the project itself, to include the Lake Lee Dam, <br />the Big Windsor check and inlet stmcture, and the Finley check stmcture. Security for the loan will be <br />collateral in compliance with CWCB Loan Policy NO.5 (Collateral). <br /> <br />Staff further recommends that final approval of the loan be conditioned upon all standard-contracting <br />provisions of the CWCB. <br /> <br />cc: Barry Anderson, President, Larimer and Weld Irrigation Company <br />Duane Smith, Smith Geotechnical Engineering Consultants <br />Vaughn McWilliams, CWCB <br />Amy Stengel, AGO <br /> <br />4 <br />Flood Protection. Water Project Planning and Financing. Stream and Lake Protection <br />Water Supply Protection. Conseryation Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.