My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
CA3
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
CA3
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:38:56 PM
Creation date
9/28/2007 10:18:59 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
9/18/2007
Description
CF Section - Changes to Existing Loans - Larimer and Weld Irrigation Company
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />ST A TE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denyer, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />Bill Ritter Jr. <br />Goyernor <br /> <br />MEMORANDUM <br /> <br />Rarris Sherman <br />Executiye Director <br /> <br />TO: <br /> <br />Colorado Water Conservation Board Members <br /> <br />Dan McAulilife <br />Acting CWCB <br />Director <br /> <br />FROM: <br /> <br />Tim Feehan, P.E., Project Manager <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br /> <br />DATE: <br /> <br />August 20, 2007 <br /> <br />SUBJECT: <br /> <br />Consent Agenda Item No.3, September 18-19,2007 Board Meeting <br />Water Supply, Planning and Finance - Changes to Existing Loans <br />Larimer and Weld Irrigation Company <br /> <br />INTRODUCTION <br /> <br />At the May 2005 Board Meeting, the Board authorized staff to present revisions to existing <br />loans, totaling less then 20% of the original loan, as Consent Agenda Items. The Larimer and Weld <br />Irrigation Company loan increase presented below represents a 6.9% increase to the Company's original <br />estimated proj ect cost. <br /> <br />At the September 2004 board meeting, the Colorado Water Conservation Board (CWCB) approved <br />a loan to the Larimer and Weld Irrigation Company (Company) in the amount of $1,515,000 from the <br />Severance Tax Tmst Fund Perpetual Base Account. The $1,515,000 loan was for the reconstmction of the <br />Lake Lee Dam, the Big Windsor Inlet, and the Finley Check Stmcture. <br /> <br />The Company is requesting (see attached letter), an increase of $105,492 to the Company's 2004 <br />authorization of $1,515,000, for the design and constmction of the three stmctures indicated above. <br />The requested loan increase is due to cost overmns associated with the Big Windsor Inlet and Lake Lee <br />Dam. <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conseryation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.