My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150115 Letter of Substaintial Completion
CWCB
>
Loan Projects
>
Backfile
>
2001-3000
>
C150115 Letter of Substaintial Completion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 9:40:27 AM
Creation date
9/14/2007 3:41:03 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150115
Contractor Name
Riverside Ditch and Allen Extension Company, The
Contract Type
Loan
Water District
11
County
Chaffee
Bill Number
MC3
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> Colorado Water Conservation Board <br /> Project Expenditure Schedule <br /> Riverside Ditch and Allen Extension Siphon Project <br />Sponsor: Riverside Ditch and Alien Ext. Loan Contract No,: Cl501l5 <br />Address: P ,0, Box 892 Authorization: $50,000,00 <br /> Buena Vista, Colorado 81211 Interest: 2,75% <br />Contact: / Susan Miller, Secretary Term: 30 <br />Telephone: 719-395-2935 Conditions: Up to 90% <br />Fax: Tax l.D, No,: 84-1210299 <br /> Substantial <br />E-mail: Completion Date: 8/1 /2003 <br /> Balance <br />Loan Disb. Amount Cumulative Loan Available to Accrued <br />No. Date Description Disbursed Balance Loan Interest Interest <br /> $ 50,000.00 <br />I 4/7/2003 Construction $ 21,970,11 $ 21,970.11 $ 28,029,89 $ 192,01 $ 192,01 <br />1 5/13/2003 Construction $ 21,677.99 $ 43,648.1 0 $ 6,351.90 $ 130,66 $ 322,67 <br />
The URL can be used to link to this page
Your browser does not support the video tag.