My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01154 (2)
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01154 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:22:31 AM
Creation date
9/14/2007 3:24:20 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150110
Contractor Name
Four Seasons Trout Farm
Contract Type
Loan
Water District
40
County
Delta
Bill Number
HB 02-1152
Loan Projects - Doc Type
Project Completion Letter
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br />www.cwcb.state.co.us <br /> <br /> <br />April 3, 2003 <br /> <br />Bill Owens <br />Governor <br /> <br />NOTICE OF PROJECT SUBSTANTIAL COMPLETION AND REPAYMENT SCHEDULE Greg E. Walcher <br />Executive Director <br /> <br />John E. Niblack <br />Four Seasons Troul Farm <br />P.O. Box21 <br />Cederedge Colorado 81413 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contracl Number CI501l0 - Trout Farm Rehabilitation Project <br /> <br />Dear Mr. Niblack, <br /> <br />TIris letter is 10 advise you that the work descnbed in the above referenced Contract was substantially completed as of <br />March 1,2003. <br /> <br />In accordance with the Contract, the Four Seasons Trout Farm owes $84.33 for inlerest during construction, as calculated <br />on the attached spreadsheel, due on April 18, 2003. Make your check for interest during construction payable 10 the Colorado <br />Water Conservation Board and include the Contract Number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your flIst loan payment in the amount of $9,643.35 is <br />due on March I, 2004. Please see the attached Repayment Schedule and a copy of the Promissory Nole. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that the <br />renewed insurance certificales need 10 be provided to the Colorado Water Conservation Board annually. <br /> <br />11 has been a pleasure of the Colorado Water Conservation Board 10 work with the Four Seasons Trout Farm on the <br />successful completion of this project Please call if you have any questions regarding this matter or ifwe can be of service 10 you <br />in the fuiure. <br /> <br />Sincer~ J:# <br />~t,P.E. <br />Chief; Water Supply Planning and Finance Section <br /> <br />cc. <br /> <br />Keith Catlin, CWCB Board Member <br />DNR Accounting <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Accounts Receivable <br /> <br />Contract Amount = $85,500.00 <br />Expended Amount = $85,500.00 <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.