My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01456 (2)
CWCB
>
Loan Projects
>
Backfile
>
1001-2000
>
PROJC01456 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2011 3:25:36 PM
Creation date
9/14/2007 3:14:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150096
Contractor Name
Upper Platte and Beaver Canal Company
Contract Type
Loan
Water District
1
County
Morgan
Bill Number
SPL
Loan Projects - Doc Type
Project Completion Letter
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'I <br /> <br />" <br /> <br />STATE OF COLORADO <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 72] <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 8664474 <br />www.cwcb.state.co.us <br /> <br />.' >ti:f;,~, CONsekf:i.,"'" <br /> <br />o "0 <br />~ " <br />'" .. <br />o : , 0: <br /> <br />~ ~ <br /><;:\: . .".i: <br />. ':1-9!31~-" <br /> <br />November 5, 2002 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />NOTICE OF PROmer SUBSTANTIAL COMPLETION AND REPAYMENT SCHEDULE Executive Director <br /> <br />Philip Mortenson, President <br />Upper Platte and Beaver Canal Company <br />P,O. Box 581 <br />Brosh, CO 80723 <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Number CI50096 - Headgate Rehabilitation Project <br /> <br />Dear Mr. Mortenson, <br /> <br />'This letter is to advise you that the work described in the above referenced Contract was substantially completed as of <br />September I, 2002. <br /> <br />In accordance with the Contract, the Upper Platte and Beaver Canal Company owes $25.58 for interest during <br />construction, as calculated on the attached spreadsheet, due on November 20, 2002. Make your check for interest during <br />construction payable to the Colorado Water Conservation Board and include the Contract Number on the check. <br /> <br />As outlined in the Promissory Note, Appendix 2 of the Contract, your first loan payment in the amount of $9,361.38 is <br />due on September I, 2003. Please see the attached Repayment Schedule and a copy of the Promissory Note. <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A.6, please note that lhe <br />renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually. <br /> <br />It has been a pleasure of lhe Colorado Water Conservation Board to work wilh the Upper Platte and Beaver Canal <br />Company on the successful completion of this project Please call if you have any questions regarding this matter or ifwe can be <br />of service to you in lhe future. <br /> <br />~~ <br /> <br />'~ <br /> <br />Mike Serlet, P .E. <br />Chief, Water Supply Planning and Finance Section <br /> <br />cc. <br /> <br />Eric Wilkinson, CWCB Board Member <br />DNR Accounting <br />Water Supply Planning and Finance Section <br />Project file <br />Contract file <br />Accounts Receivable <br />Attorney General's Office <br /> <br />Contract Amount = $83,000.00 <br />Expended Amount ~ $83,000.00 <br /> <br />Flood Protection. Water Supply Planning and Finance. Streain and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />
The URL can be used to link to this page
Your browser does not support the video tag.