Laserfiche WebLink
. , <br />Cedar Mesa Ditch and Reservoir Company Agenda Item 9b. <br />Jury 23-24, 2001 (Updated July 26, 2001) <br />Borrower: <br />Project Name: <br />Water Project Construction Loan Program-Project Data <br />Cedar Mesa Ditch & Res. Co. <br />Cedar Mesa Dam <br />Drainage Basin: Gunnison <br />Total Project Cost: $131,667 <br />Type of Borrower: Agricultural <br />CWCB Small Project Loan: $100,000 <br />CWCB Grent: $4850 (Feasibility Study) <br />Median Household Income: N/A <br />Loan Terms: 3.5°lo for 30-years <br />Average diversions: 903 acre-feet <br />The Cedar Mesa Ditch and Reservoir Company operates the Cedar Mesa Dam for the benefit of <br />its 24 shareholders by providing storage of irrigation water for delivery to a service area on the <br />Cedar Mesa. The dam is located on the Grand Mesa, about 12 miles north of Cedaredge. The <br />dam has a seepage problem and rehabilitation work needs to be completed in fall 2001. The <br />reservoir capacity is 903 acre-feet. The Cedar Mesa Ditch and Reservoir Company is a mutual <br />ditch and reservoir company and a nonprofit corporation registered in the State of Colorado. <br />Mike Smith of Knight Piesold Engineers has completed the feasibility study. Proposed funding <br />for the project consists of a CWCB Small Project Loan for $100,000, a$6,500 grant from the <br />Colorado River Water Conservation District, a$4850 grant from the CWCB, and private <br />funding. <br />County: Delta <br />Project Type: Rehabilitation <br />Water Source: Bonita Creek <br />Funding Sources: CWCB, CRWCD, Private <br />Location Map <br />