Laserfiche WebLink
<br />STATE OF COLORADO' <br /> <br />Colorado Water Conservation Board <br /> <br />Department of Natural Resources <br />1313 Sherman Street, Room 721 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 8664474 <br />www.cwcb.state.co.U5 <br /> <br />.~~l'-CONS~~.. <br /><:> -0 <br />~ -; <br />o ' , 0 <br />~ ~ <br />. . <br />. . 1911 .' <br /> <br />September 16, 2003 <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director <br /> <br />NOTICE OF PROJECT SUBSTANl'lAL COMPLEfION AND REPAYMENT SCHEDULE <br /> <br />Rod Kuharich <br />CWCB Director <br /> <br />Mr, Fred Walker, President <br />The Tunnel Water Company <br />P.O, Box 1584 <br />Fort Collins, CO 80522 <br /> <br />Dan McAuliffe <br />Deputy Director <br /> <br />Re: Contract Number C150052 and C150065 - Twmel Rehabilitation Project <br /> <br />Dear Mr, Walker, <br /> <br />This letter is to advise you that the work described in the above referenced Contract was substantially <br />completed as ofDecernber 1, 2002, <br /> <br />In accordance with the Contract, The Twmel Water Company owes $202,137,65 for interest during <br />construction, as calculated on the attached spreadsheet As indicated in Jan ll1ian's letter dated August 1, 2003, you <br />were previously charged $265,392.26 for interest during construction based on a substantial completion date of May <br />1,2003, The revised substantial completion date of December 1, 2002 results in a prepayment towards principal to <br />you in the amount of $63,254,61. Your fIrSt loan payment due on December 1,2003 has been adjusted accordingly, <br />which is shown on the attached Amortization Schedule, <br /> <br />The Tunnel Water Company obtained two separate loans from the Colorado Water Conservation Board, <br />Contract Number C150052 for $1,600,000 at 4,5% for 30-years and Contract Number C150065 for $2,080,000 at <br />43% for 30-years, for a combined total loan amount of $3,680,000, The total loan ftmds disbursed to the Tunnel <br />Water Company is $3,481,400,48, At the request of The Twmel Water Company, Contract Nwnber C150065 has <br />been amended to an amount of $1,881,400,48 to reflect the $198,599.52 that was not disbursed, <br /> <br />As outlined in the Promissory Note, Appendix 2 of Contract C150052, your fIrSt loan payment in the amount <br />of $98,226,47 is due on December 1, 2003, Additionally, your first loan payment for Contract Number C150065 in <br />the amount of $112,799.20 is due on December 1, 2003, Jan lllian, our Contract Administrator has provided you <br />with a new promissory Note for Contract Number C150065 to reflect the new loan amount of$1,88l,400,48, <br /> <br />In accordance with the Borrower's Liability Insurance Provision of the Contract, Paragraph A,6, please note <br />that the renewed insurance certificates need to be provided to the Colorado Water Conservation Board annually, <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />