Laserfiche WebLink
<br />Mr. Fred Walker, President <br />Tunnel Water Company <br />September 29, 2000 <br /> <br />Page 2 <br /> <br />c) You must adhere to the CWCS Desion and Construction Administration Procedures. <br />Tim Feehan will contacted you regarding the CWCS requirements concerning project <br />bidding, design, and construction. Tim will make construction inspections, which will <br />be the basis of the monthly pay estimates for disbursement of your loan funds. <br /> <br />d) You must adhere to the CWCS Guidelines for Financial Assistance. A copy of our <br />Guidelines is attached. <br /> <br />On behalf of the Soard, I would like to thank you for applying for an Emergency Loan from <br />the Colorado Water Conservation Board. <br /> <br />Sincerely, <br /> <br />Mike Serlet, P.E., Chief <br />Water Supply Planning and Finance Section <br />Colorado Water Conservation Board <br /> <br />Attachments: <br /> <br />1. Updated Memo: TunneIWaterCo900memo <br />2. Construction Fund Guidelines <br /> <br />co (w/Attaohment 1.): <br /> <br />Mr. Eric Wilkinson, Board Member, Colorado Water ConS6IVation Board <br />Don Deere P.E., Rocky Mountain Consultants, 825 Delaware Ave. Suite 500, Longmant, CO 80501 <br />CWCB Section B Staff <br />Linda Bassi, AGO <br />Chrono File <br /> <br />c: wp51\Proj-NewlTunneIWaterCo900itr <br />