My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Phase II_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Phase II_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:28:15 PM
Creation date
9/13/2007 1:19:50 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Domestic Water Construction Project
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
150462
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />COLORADO <br /> <br />~ <br /> <br />DEPARTMENT OF <br />NATURAL <br />RESOURCES <br /> <br />WATER SUPPLY RESERVE ACCOUNT <br />2006-2007 GRANT APPLICATION FORM <br /> <br /> <br />COLORADO WATER CONSERVATION BOARD <br /> <br />Goodman Point Water Association <br />Domestic Water Construction Proiect <br /> <br />McElmo Creek Basin <br /> <br />Name of Water Activity/Project <br /> <br />River Basin Location <br /> <br />$ 20,000 <br />$240,000 <br />(12.8% of project <br />cost) <br /> <br />o Basin Account <br /> <br />'~ Yes <br /> <br />Amount of Funds Requested <br /> <br />o Statewide Account <br />Please Check Applicable Box <br /> <br />D No <br /> <br />Approval Letter Signed By <br />Roundtable Chair and <br />Description of Results of <br />Evaluation and Approval <br />Process <br /> <br />* For the Basin Account, the Application Deadline is 60 Days Prior to the Bimonthlv CWCB meeting. <br />The CWCB meetings are posted at www.cwcb.state.co.us and are generally the third week of the month. <br />* For the Statewide Account, the Application Deadline is 60 Days Prior to the March and September <br />CWCB Board Meetings. <br />* In completing the application you may attach additional sheets if the fom1 does not provide adequate space. <br />If additional sheets are attached please be sure to reference the section number of the application that you are <br />addressing (i.e., A.l. etc.). <br />Instructions: This application form must be submitted in electronic format (Microsoft Word or <br />Original PDF are preferred). The application can be emailed or a disc can be mailed to the address at the <br />end of the application fom1. The Water Supply Reserve Account Criteria and Guidelines can be found at <br />http://cwcb.state.co.us/IWMD/. The criteIia and guidelines should be reviewed and followed when <br />completing this application. You may attach additional sheets as necessary to fully answer any question, or <br />to provide additional information that you feel would be helpful in evaluating this application. Include with <br />your application a cover letter summarizing your request for a grant. If you have difficulty with any part of the <br />application, contact Rick Brown of the Intrastate Water Management and Development (Colorado Water <br />Conservation Board) for assistance, at (303) 866-3514 or email Rick at rick.brown(ZV,state.co.us. <br />Generally, the applicant is also the prospective owner and sponsor of the proposed water activity. If this is not <br />the case, contact the Rick Brown before completing this application. <br />
The URL can be used to link to this page
Your browser does not support the video tag.