My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Southwest - Goodman Point Phase II_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Southwest - Goodman Point Phase II_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2012 12:28:15 PM
Creation date
9/13/2007 1:19:50 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Southwest
Applicant
Goodman Point Water Association
Description
Goodman Point Water Association Domestic Water Construction Project
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
150462
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br />Form Revised April 2007 <br /> <br />Attachment 1 <br />NOTE: (Refer to the Cost/Budget information in the GPW A Preliminary Engineering Report) <br />Sample Budget Table: Please note that this budget table is an example and will need to be adapted to fit each individual <br />application. In the tables below please list the personnel by specialty/ expertise i.e. project manager, project engineer, etc. <br />Also, tasks should correspond to the scope of work of your project and the number of tasks listed will vary accordingly. <br /> <br /> Total Costs <br /> Matching Funds <br /> Labor Other Direct Costs (If Applicable) Total Proiect Costs <br />Task 1 - (Specify name of task) <br />Task 2 - <br />In-Kind Contributions <br />Total Costs: <br /> <br />1) Identify specific source and amount by task. <br />E I Ttl <br /> <br /> xample I es <br />Example Project Project Project Geologist Scientist Graphics/ Clerical Total <br />Personnel: Manage Engineer Designer Costs <br /> r <br />Hourly Rate: <br />Task 1 - <br />Task 2 - <br /> <br />~ <br /> <br />Total Hours: <br />Cost: <br /> <br /> Other Direct Costs <br /> Item: Copies Materials Equipment/ Mileage Total <br /> Supplies <br /> Units: No. Miles <br />Unit Cost: <br />Task 1 - <br />Task 2 - <br />Total Units: <br />Total Cost: <br /> <br /> In-Kind Contributions (If Applicable) <br />Project Personnel: <br /> Hourly Rate: Total <br />Task 1 - <br />Task 2 - <br /> Total Hours: <br /> <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.