Laserfiche WebLink
<br />Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br /> <br />Heyborne Recharge Project Phase I <br /> <br />Task 1 <br /> <br />. Description of task: Conduct preliminary investigations into feasibility <br /> <br />. Method or procedure that will be used or followed to accomplish the task and identify who will <br />undertake the task: Ducks Unlimited has contacted landowners, the state engineer, LSPWCD, SPLRG, <br />and SPWRAP to determine interest and potential project feasibility. SPLRG has conducted soil core <br />samples to determine suitability of sites for recharge. Ducks Unlimited will pursue agreements with <br />landowners to proceed with project. <br /> <br />. Description ofthe major deliverables!products that will be produced upon successful completion of the <br />task: <br /> <br />· Core sample locations and report will be d~livered by SPLRG <br /> <br />· A detailed preliminary report of findings for water availability in the lower river <br /> <br />· Conservation Agreements signed with landowners <br /> <br />Task 2 <br />. Description of task: Conduct and complete a survey and design <br /> <br />. Method or procedure that will be used or followed to accomplish the task and identify who will <br />undertake the task: Ducks Unlimited surveyors will conduct a survey of the impacted area, identified <br />on the attached map. A topographic survey will be developed using Trimble GPS technology. From the <br />survey, maps will be produced using AutoCAD 2007 which will illustrate the 6" or 12" contours of the <br />micro topography. DU's professional engineers will work with landowners, and the contracted <br />professional water engineers to provide a detailed design of wetland impoundments, water level control <br />structures, and water delivery infrastructure, including pipeline. <br /> <br />. Description of the major deliverables/products that will be produced upon successful completion of the <br />task: <br /> <br />· Deliverables will include a detailed survey and design of the wetland project for the area <br />illustrated in the conceptual plan. <br /> <br />· Provide a detailed bid package including all plans and specifications, and quantities for <br />materials and equipment. <br /> <br />Task 3 <br />. Description oftask: Complete water engineering and water court filings <br /> <br />24 <br />