Laserfiche WebLink
Water Supply Reserve Account – Grant Application Form <br />Form Revised O ctober 2006 <br />_______________________________________ <br /> <br /> <br />Water Availability and Sustainability – this information is needed to assess the viability and effective ness <br />7. <br /> <br />of the water project or activity. Please provide a description of each water supply source to be utilized <br />for , or the water body to be affected by, the water activity. For water supply sources being utilized, <br /> <br />describe its location, yield, extent of development, and water right status . For water bodies being <br /> <br />affected, describe its location, extent of development, and the expected effect of the water activity on the <br />water body, in either case, the analysis should take into consideration a reasonable r ange of hydrologic <br /> <br />variation. Attach additional sheets as needed. <br /> <br /> <br />The Paonia Ditch is the senior ditch on the North Fork of the Gunnison. Decree dates , <br /> <br /> <br />amounts, and pertinent information for the two diversions are as follows : <br /> <br /> <br /> <br /> Feldman Ditch – 1.9 0 cfs, 1914 decree when stream is low; 1.90 cfs, 1976 decree , high water <br />only. <br /> <br /> <br /> <br /> Paonia Ditch – 9.05 cfs, 1901 decree, the ditch also carries water for <br /> Wade and Hightower ditches – 4.05 cfs, 1901 decree, so the total 1901 decree <br /> <br />in the Paonia ditch is 13.10 cfs (which can take all water in the river at certain low flow <br /> <br />periods). <br /> <br /> P aonia Ditch also has 21.44 cfs, 1937 decree, high water only. <br /> <br /> <br /> Water Commissioner Steve Tuck provided the following comment regarding the Paonia <br /> <br />Ditch: “ Some years I turn fl ow past the Paonia Ditch diversion to supply the Short Ditch, <br />but most of the time the Paonia diversion is the ditch that calls the total North Fork, on <br /> <br />an average from July 1 to October. ” <br /> <br /> <br /> <br /> <br /> <br />8. <br />If you have not specifically and fully address ed the Evaluation Criteria found in Part 3 of the criteria <br /> <br />and guidance document please provide additional detail here. Attach additional sheet(s) if needed. <br /> <br /> <br />There is no known opposition to the project. There is substantial support for the project <br /> <br />from t he ditch companies, the local Water Commissioner, and the recreating public. <br /> <br /> <br /> <br />An Army Corps of Engineers 404 permit will be required for in - stream work. <br /> <br /> <br />The project will be completed in less than six months, therefore progress reports are not <br /> <br />anticipate d. <br /> <br /> <br />No partners, other than those listed as sources of funds, are involved. <br /> <br /> <br /> <br />13 <br /> <br />