My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Paonia Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)_Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Paonia Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2012 1:45:10 PM
Creation date
9/13/2007 10:43:23 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
North Fork River Improvement Association
Description
Paonia-Feldman Diversion Reconstruction Project (Part 1 - Feasibility Study)
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
150411
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account – Grant Application Form <br />Form Revised October 2006 <br />_______________________________________ <br /> <br />5. <br />Please provide a copy of the proposed scope of work. Please refer to Part 2 of the criteria and guidance <br />document for detailed requirements. Attach additional she ets as needed. <br /> <br /> <br /> <br />Scope of Work <br /> <br />• <br /> <br /> <br />1. Preliminary Site Assessment and Feasibility Study completed in 2004 and includes: <br />? <br /> <br />Digital orthophotography with one - foot contours by Aero - Metrics - cost $8,050 <br />? <br /> <br />Ground control and property boundaries by Wilmore & Co - cost $9,9 09 <br />? <br /> <br />Environmental Assessment by Bio - Logic - cost $4,641 <br />? <br /> <br />Alternative Analysis and Preliminary Site Plan by Crane Associates - cost $5,916 <br />? <br /> <br />Total work completed=$28,516 <br /> <br /> <br />2. Construction Plans: Detailed plans, estimates and bid documents to be developed by Crane <br />Assoc iates within 3 0 days of approval of project funding. Cost - $11, 7 00 <br /> <br /> <br />3. M obilize construction materials: 500 cubic yards of three foot and four foot or greater size <br />boulders, located above Paonia Reservoir in CDOT stockpiles. M aterial will be hauled 26 <br />miles f rom the stockpile sites to the construction site. Haul trucks and trackhoe for <br />loading rocks will be locally contracted. Completed within 60 days of commencement. <br />Cost - $ 32,500 <br /> <br /> <br />4. Project Administration: Coordinate with landowners, water users and contractor s, <br />financial management , preparation and delivery of reports . Completed within 30 days of <br />end of mobilization . Cost - $ 5,310. <br /> <br />See separate sheet for budget <br /> <br />Deliverables <br />• <br /> <br /> <br /> <br />1. Engineering and construction plans and specifications. <br /> <br />2. A project report with executive summary, detailed description of the project, cost data, <br />map , and photographs. <br /> <br /> <br /> <br /> <br />10 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.