My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Gunnison - Paonia Reservoir Sedimentation Study Application
CWCB
>
WSRF Grant & Loan Information
>
Backfile
>
Gunnison - Paonia Reservoir Sedimentation Study Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2012 11:56:01 AM
Creation date
9/13/2007 10:24:19 AM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Gunnison
Applicant
North Fork Water Conserv. District and Fire Mountain Canal and Reservoir Co.
Description
Paonia Reservoir Sedimentation Management Study
Account Source
Basin
Board Meeting Date
9/19/2007
Contract/PO #
150414
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />in pursuing sediment mitigation but are not in a position to contribute funding to the project. <br />These entities might be able to contribute technical expertise, political support or administrative <br />assistance. These groups might include, but are not be limited to, the U.S. Natural Resource <br />Conservation Service, the U.S. Bureau of Reclamation, the U.S. Fish and Wildlife Service, the <br />U.S. Geological Survey, the local Soil Conservation District, local water users groups, the <br />Colorado Department of Health and Environment, the Colorado Division of Wildlife, the North <br />Fork River Improvement Association and the Colorado Water Conservation Board. The <br />potential interested parties will be identified and contacted to determine interest and ability to <br />assist. <br /> <br />7. Meetings and Preparation of Report - Status and steering meetings will be held with the <br />North Fork Water Conservancy District and other interest parties at selected intervals. A final <br />report will be prepared which summarizes the investigations performed and their results, <br />provides updated cost estimates for the alternatives, presents advantages and disadvantages of <br />each alternative and presents conclusions and recommendations for future action. <br /> <br />A time schedule along with a schedule of costs and a detailed study cost estimate are included <br />with this supplement. <br /> <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.