My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00546 App
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00546 App
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
9/11/2007 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150005
Contractor Name
Loveland, City of
Contract Type
Loan
Water District
0
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Figure 1 <br /> <br />Figure 2 <br /> <br />Figure 3 <br /> <br />Figure 4 <br /> <br />Figure 5 <br /> <br />Figure 6 <br /> <br />LIST OF FIGURES <br /> <br />.eag.e <br /> <br />Location Map <br /> <br />1 <br /> <br />System Schematic <br /> <br />2 <br /> <br />Projected Demands and 100-year Drought Yields <br />- Based on a projected accumulation of water tied <br />to a 3.5% annual population growth rate as <br />specified In the design conditions. <br /> <br />5 <br /> <br />Capital Costs of Slngle-Plim Elements - Based <br />upon the Phase II recommended level of <br />Implementation, and shown in terms of the cost <br />per acre-foot of deficit reduction. Only <br />single-plan elements capable of eliminating the <br />deficit during a 100-year drought are shown. <br /> <br />7 <br /> <br />Capital Cost of Multi-Element Alternatives - <br />Based on the phase II recommended level of <br />implementation, and shown in terms of the cost <br />per acre-foot of deficit reduction. Shown are the <br />least-cost alternative, No.1, involving the <br />purchase of both C-BT water and additional No.1 <br />water rights In the river; and two options available <br />using Alternative No.2. Those two options are the <br />purchase of additional C-BT water in conjunction <br />with additional reservoir storage at either Green <br />Ridge Glade or Maitland Reservoir. The cost of <br />the third Multi-Element Alternative, construction <br />of Maitland Reservoir with 7,350 acre-feet of <br />capacity, Is not directly comparable with the other <br />alternatives. Its Implementation, with the <br />projected 101,050 population, goes beyond the <br />scope of the study and provides additional <br />protection to the City. <br /> <br />8 <br /> <br />100-year Drought Yields and Demands - Shows a <br />breakdown of 100-year drought yields by supply <br />source compared to demands for two <br />populations: 36,000 and 101,050 citizens. A <br />breakdown of average-year yields Is also shown <br />for 101,050 population. <br /> <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.