My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00546 App
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00546 App
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
9/11/2007 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150005
Contractor Name
Loveland, City of
Contract Type
Loan
Water District
0
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.".:"-' <br /> <br />5. Please indicate: The number of shareholders: <br />or <br />The number of customers: A.pprmrim~tely 44.300 people served by 16,200 taps. <br /> <br />6. What is the purpose of this project? Check one: <br />_ New project <br />_ Rehabilitation or replacement of existing facility <br />--X1L Enlargement of existing facility <br />_ Emergency repair <br />Other (please describe) <br /> <br />7. If the project is for rehabilitation of an existing dam, is the dam currently under a restriction by <br />the State Engineer? HI A <br /> <br />8,-Generallocation of the proposed project. Include county and approximate distance and <br />direction from the nearest town or city: Larimer Countv. aDDroximatelv <br />seven miles west of the City of Loveland, immediately above <br />the Chasteen's Grove Water Treatment Plant in Green Ridl!:e Glade. <br /> <br />9. Please provide a brief narrative description of the proposed project including purpose, <br />facilitites, types of water use to be served, and service area (if known at this time). Attach <br />additional pages, maps, or drawings as needed. <br />Please see attachment. <br /> <br />10. Please list any peliminary analyses or investigations which have been done or or are in <br />progress for the proposed project along with the names of the persons or firms who prepared the <br />analyses: ."Citv of Loveland Raw Water SUDDlv Svstem" study by CauQ>, Dresser & McKee <br />"Phase I - Drou2ht Studv". Au2ust 18. 1986 <br />"Phase II - Evaluation of Alternatives", January 12, 1988 <br />."Engineering Evaluation, Green Ridge Glade Reservoir Enlargement", <br />March 12. 1996. GEl Consultants. Inc. CODies of those reD arts have been provided <br />for CWCB staff. <br />11. If preliminary cost estimates have been made, indicate the estimated cost of the <br />project: $17.251.000 - December 1995 <br /> <br />12. Are you intending to apply for a feasibility study loan from the CWCB Construction Fund? <br />Yes <br /> <br />C2~/14/k ~ <br />~~ <br />S' nature <br /> <br />P'd6~ 9~ <br />Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.