My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00546 App
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00546 App
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:27 AM
Creation date
9/11/2007 3:04:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150005
Contractor Name
Loveland, City of
Contract Type
Loan
Water District
0
County
Larimer
Bill Number
HB 98-1189
Loan Projects - Doc Type
Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />10 <br /> <br />. . <br />. <br /> <br />Phase II Recommendations 5,~/rc <br />,ft <br />If' .,,,,-,, <br />/~(~ <br />, pl!r(f)j '1' <br />r' "0<1' <br />I' <br />. Expand Green Ridge Glade to 3,500 Ac-Ft total capacity <br /> <br />. Purchase additional 1,245 CoST units <br /> <br />. Implement exchanges of stored transfer decree water <br />with No. 1 water <br /> <br />. Apply for new direct-flow right (capture "free" water) <br /> <br />. Expand current water conservation measures to Include: <br /> <br />- Installation of low-flow devices In new <br />construction <br /> <br />- Landscaping limitations In new construction <br /> <br />- Leakage reduction program <br /> <br />- Water restrictions during droughts <br /> <br />. Expand Chasteen Grove Treatment Plant to 46 MGD <br />when needed <br /> <br />Table 4: Recommendations as accepted by City Council <br />
The URL can be used to link to this page
Your browser does not support the video tag.