Laserfiche WebLink
<br />4 <br /> <br />Phase 11- Design Conditions <br /> <br />. Annual Demand = 21,261 Ac-A (Year 2015 Moderate <br />Growth, 31/2 % Annual Rate) <br /> <br />. Projected Supplies <br /> <br />13,455 C-BT units <br /> <br />40 Windy Gap shares <br /> <br />City-owned direct-flow (Big Thompson) <br /> <br />Ownership In a number of private irrigation <br />ditch and reservoir companies through the <br />City's Transfer Decree <br /> <br />. 1 OO-year deficit = 2,745 Ac-Ft <br /> <br />Table 2: Design Conditions Used for Phase II <br />