Laserfiche WebLink
<br />W[NDY GAP FlRMiNG l'ROJECT- PURPOSE AND NEED REPORT <br /> <br />e;J <br />~J <br />---.. <br />W <br />e;J <br /> <br />1'0 <br />e;J <br />e;J <br />-~ <br /> <br />T bl lOW. d G Fi <br /> <br />p <br /> <br />t C t 'b ti <br /> <br />M ti F' <br /> <br />Y' ld N d <br /> <br />e;J <br />co <br />Ul <br />.j:> <br /> <br />a e . m IV liD nmn~ ro]ec on n II on to ee ng urn Ie ee . <br /> Windy Gap 2030 Firm Yield Percent or ZOJO 2050 Firm Yield Percent of 2050 <br /> Firming Project 2030 Firm Yield DeRdt with the Firm Yield Deficit 2050 Firm Yield Deficit with the Firm Yield DeRdt <br />Participant Estimated Firm Deficit WGFP Met by WGFP Deficit WGFP Met hy WGFP <br /> Yield <br /> AF % AF % <br />Broomfie Id 5,600 -9,361 -3,761 60% .10,661 -5,061 53% <br />CWCWD 100 -1,914 -1,814 5% - J, 114 -3,014 J% <br />Erie 2,000 -6,755 -4,755 30% -6,755 -4,755 JO% <br />Evans 500 -1,802 -1.302 28% -4,001 -3,502 11% <br />fort Luplon 300 -1,662 -1,362 18% -3,262 - 2, 962 9% <br />Gr~eley 4,400 -9,650 -5,250 46% -34,650 -30,250 13% <br />Lafayette 800 -4,066 .3,266 20% -4,066 -3,266 20% <br />LTWD 1,200 -6,590 -5,390 18% -13,590 -12,390 9% <br />Longmunt 5,125 -7,137 -2,012 72% -11,337 -6,212 45% <br />Loujsville 900 -1,437 -537 63% - J ,837 937 49% <br />loveland 4,000 -6,908 -2,908 58% -10,508 -6,508 38% <br />MPWCD1 [3,000]1 NA N.A. N.A. NA N.r\. NA <br />Platte River J 5,150 -5,150 0 100% .5,150 0 100"10 <br />Superior 1,500 -1,756 ..:256 85% -1,756 -256 85% <br />Total 31,575 -64.188 -32,613 49% -lJ 0,688 -79,113 29% <br /> <br />w <br />e;J <br />W <br />--J <br />LD <br />I-' <br />e;J <br />.j:> <br />W <br />--J <br /> <br />-I <br />Al <br />3: <br />fTl <br />-l <br />Al <br />o <br />tJ <br />H <br />(f) <br />-l <br />Al <br />H <br />o <br />-l <br /> <br />'The proposed WGFP would fmn 3,000 AF of .!Ilorage for the benefit of !he lVfPWCD and their various contractees in Grand llnd Summit Counties. II.fPWCD <br />storage in rue WGFP does nol have carry-over capacity from yeM to year, bullhey receive the first water available each year, so a finn yield on,ooo AF per <br />year is estimated. This yield would conlribute to meeting bol\1 existing needs and the estimated rncrcase jn demand of J 7,000 AF by 2030. Detailed infonnation <br />is not available to calculate specific water supply deficits. <br /> <br />~~WWCD finn yield is not included in the fum yjeld toral with W.indy Gap Project unil holders, <br /> <br />.3 Platle River Power Authority needs 5,150 AF of reusable water to mee[ existrng need,,_ Fulure waler needs are expected ill increase with the demand for <br />additional puwer generation, but these amounts have not been determined, <br /> <br />-0 <br />Do <br />(j) <br />fTl <br /> <br />61 <br /> <br />I-' <br />e;J <br />---.. <br />I-' <br />IS! <br />