Laserfiche WebLink
<br />DRAFT <br />PURPOSE AJ"IO NEED REJ'(JRT FOR THE WJNOY GAP FIRMING PROJECT <br /> <br />CSl <br />-..j <br />--..... <br />loJ <br />CSl <br /> <br />~,~ <br /> <br />1'0 <br />CSl <br />CSl <br />-..j <br /> <br />Tbl8 P . <br /> <br />dT lR W <br /> <br />R <br /> <br />CSl <br />OJ <br />Ul <br />.j:>. <br /> <br />a e . rOlccte ota aw ater eQUlrements. <br />Partiripaot 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050 <br />Broomfield 14.300 17,300 19,400 20,500 21,700 23,100 24,400 24,400 24,400 24,400 <br />CWCWD 3,200 3,6{)0 3,900 4,200 4,500 4,700 5,100 5,400 5,600 5,900 <br />Erie 2,500 4,400 5,900 7,400 8,900 8,900 8,900 8,900 8,900 8,900 <br />Evans 4,600 5,900 7,000 8,400 9,700 11,100 12,800 13 ,300 13,300 13 ,300 <br />Fori Lupron 4,100 4,200 4,400 4,700 5,000 5,200 5,600 5,900 6,300 6,800 <br />Greeley 27,700 32,400 37,800 43,900 48,500 53,500 59,000 65,000 71 ,500 78,500 <br />Lafayette 4,500 5,500 6,500 7,500 &,500 8,600 8,600 8,6{)0 8,600 8,600 <br />L T\VD 6,000 7,000 8,200 9,400 10,700 12,100 13.500 15,200 17,000 19,Joo <br />Longmont] 25,900 28,100 30,300 32,500 35,900 38,100 39,150 40,200 41,250 42,300 <br />Louisville 5,000 5,300 5,600 6,000 6,300 6,500 6,700 6,900 6,900 6,900 <br />Loveland 14,400 15,900 17,800 20,000 22,500 24,700 26,800 27,300 27 ,800 28,300 <br />MPWcn! N.A. N.A N.A. N.A. N.A. NA NA NA N.A. N.A. <br />Platte <br />Rive~ 5,150 5,150 5,150 5,150 5,150 5,150 5,150 5,J50 5,150 5,J50 <br />Superior 2,500 3,000 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300 <br />Total 119,850 1)7,750 155,250 172,950 190.650 204.950 219,000 229,550 240,000 251,450 <br /> <br />w <br />CSl <br />W <br />-..j <br />LD <br />f-> <br />CSl <br />.j:>. <br />W <br />-J <br /> <br />L Longman. pmjects a buildout demand of 42,300 AF by buildout in 2048, <br />l An incremental increase in water dcmand for Grand and Summit County of 17,000 AF by 20)0 above existing use is projected, <br />] P!alle River Power Aulhority DCt.::ds 5,J50 AF of reusable water to meet existing needs. FulUre water needs are expected to increase with the demand for <br />addilional power generation, but these amounts have nol been determined, <br /> <br />I <br />;;u <br />3: <br />fT1 <br />-l <br />;;u <br />o <br />t:1 <br />H <br />(fJ <br />-l <br />;;u <br />H <br />o <br />-l <br /> <br />\J <br />D <br />(j) <br />fT1 <br /> <br />59 <br /> <br />CSl <br />OJ <br />--..... <br />f-> <br />CSl <br />