<br />DRAFT
<br />PURPOSE AJ"IO NEED REJ'(JRT FOR THE WJNOY GAP FIRMING PROJECT
<br />
<br />CSl
<br />-..j
<br />--.....
<br />loJ
<br />CSl
<br />
<br />~,~
<br />
<br />1'0
<br />CSl
<br />CSl
<br />-..j
<br />
<br />Tbl8 P .
<br />
<br />dT lR W
<br />
<br />R
<br />
<br />CSl
<br />OJ
<br />Ul
<br />.j:>.
<br />
<br />a e . rOlccte ota aw ater eQUlrements.
<br />Partiripaot 2005 2010 2015 2020 2025 2030 2035 2040 2045 2050
<br />Broomfield 14.300 17,300 19,400 20,500 21,700 23,100 24,400 24,400 24,400 24,400
<br />CWCWD 3,200 3,6{)0 3,900 4,200 4,500 4,700 5,100 5,400 5,600 5,900
<br />Erie 2,500 4,400 5,900 7,400 8,900 8,900 8,900 8,900 8,900 8,900
<br />Evans 4,600 5,900 7,000 8,400 9,700 11,100 12,800 13 ,300 13,300 13 ,300
<br />Fori Lupron 4,100 4,200 4,400 4,700 5,000 5,200 5,600 5,900 6,300 6,800
<br />Greeley 27,700 32,400 37,800 43,900 48,500 53,500 59,000 65,000 71 ,500 78,500
<br />Lafayette 4,500 5,500 6,500 7,500 &,500 8,600 8,600 8,6{)0 8,600 8,600
<br />L T\VD 6,000 7,000 8,200 9,400 10,700 12,100 13.500 15,200 17,000 19,Joo
<br />Longmont] 25,900 28,100 30,300 32,500 35,900 38,100 39,150 40,200 41,250 42,300
<br />Louisville 5,000 5,300 5,600 6,000 6,300 6,500 6,700 6,900 6,900 6,900
<br />Loveland 14,400 15,900 17,800 20,000 22,500 24,700 26,800 27,300 27 ,800 28,300
<br />MPWcn! N.A. N.A N.A. N.A. N.A. NA NA NA N.A. N.A.
<br />Platte
<br />Rive~ 5,150 5,150 5,150 5,150 5,150 5,150 5,150 5,J50 5,150 5,J50
<br />Superior 2,500 3,000 3,300 3,300 3,300 3,300 3,300 3,300 3,300 3,300
<br />Total 119,850 1)7,750 155,250 172,950 190.650 204.950 219,000 229,550 240,000 251,450
<br />
<br />w
<br />CSl
<br />W
<br />-..j
<br />LD
<br />f->
<br />CSl
<br />.j:>.
<br />W
<br />-J
<br />
<br />L Longman. pmjects a buildout demand of 42,300 AF by buildout in 2048,
<br />l An incremental increase in water dcmand for Grand and Summit County of 17,000 AF by 20)0 above existing use is projected,
<br />] P!alle River Power Aulhority DCt.::ds 5,J50 AF of reusable water to meet existing needs. FulUre water needs are expected to increase with the demand for
<br />addilional power generation, but these amounts have nol been determined,
<br />
<br />I
<br />;;u
<br />3:
<br />fT1
<br />-l
<br />;;u
<br />o
<br />t:1
<br />H
<br />(fJ
<br />-l
<br />;;u
<br />H
<br />o
<br />-l
<br />
<br />\J
<br />D
<br />(j)
<br />fT1
<br />
<br />59
<br />
<br />CSl
<br />OJ
<br />--.....
<br />f->
<br />CSl
<br />
|