Laserfiche WebLink
<br /> <br /> <br />Deliverable Phase Date <br /> December 2007 – September 2008 <br />Task 2.1.1 – Development of three <br />02/18/ 08** <br />different scenarios each representing <br />different natural gas and oil shale <br /> <br />techniques and production rates. <br /> <br /> <br />Task 2.1.2 – Table outlining the <br />number of workers needed for each <br />03/17/08** <br />energy extraction process. <br />Demographic data supporting these <br /> <br />numbers will be combined into this <br />table, along with additional <br /> <br />information gathered during the <br />survey. <br /> <br /> <br /> Alternatives Development <br />Task 2.1.3 - Table outlining the <br />03/17/08 <br />various types of energy technologies <br /> <br />and electrical demands for each <br />energy conversion and supporting <br /> <br />processes. This table will include the <br />electrical demands of the various <br /> <br />development scenarios for various <br />operations producing 100,000 barrels <br /> <br />per day (demanding approximately <br />1.2 gigawatts of dedicated electric <br /> <br />generating capacity. A summary of <br />the electrical providers gathered <br /> <br />during the survey will also be <br />provided. <br />07/16/08* <br /> <br />– <br /> <br />Task 2.2 - Table summarizing the <br /> <br />2 <br />Phase <br />output from the DSS models, <br /> <br />including a summary of the <br />conditional and increased demands on <br /> <br />wa ter rights and any potential for <br />changing the “call” in the <br />09/15/08 (Draft) <br />Yampa/White and Colorado River <br />10/2/08 (Comments Due) <br />Basins. <br />10/23/08 (Final) <br /> <br /> <br />Task 2.3 – Results of conceptual level <br />assessment of alternatives to meet <br /> <br />projected water demands (from Task <br />2.2). These results will be presented <br /> <br />in a G IS layer/database. <br /> <br /> <br /> <br /> - 14 - <br /> <br /> <br />