Laserfiche WebLink
<br />De-register the Historic Spring Creek Bridge. <br /> <br />Issue Statement: During the planning process, The Kit Carson County CPS discovered that the Spring Creek Bridge has been <br />designated a "Historic Structure." (The bridge is east ofVona on Highway 24 at the bottom of the hill.) The bridge is considered <br />unsafe by some, and the Historic Designation may inhibit proper and warranted upgrades. In fact, the very purpose of identifying <br />Historic Structures through this planning process was to lessen post-disaster delays in repairing such facilities. The Spring Creek <br />Bridge was apparently submitted and listed as Historic by the Colorado Department of Transportation (CDOT) through a survey <br />mechanism that did not include any local input. De-registering the structure now will eliminate any "paperwork" problems later <br />when the bridge is either upgraded or damaged and need repair or replacement. <br /> <br />Action Item #6 <br /> <br />Implementation Manager and strategy: KC County Road and Bridge Department with the State Historic Preservation Officer <br />(SHPO) and CDOT. Bring this situation to the attention of the concerned parties, and if consensus is reached, apply to have the <br />structure de-registered <br /> <br />Priority: Low <br /> <br />is an administrative action <br /> <br />is necessary. This <br /> <br />Explanation: N/ A <br /> <br />No funding <br /> <br />Cost- Effectiveness <br /> <br />Cost Estimate <br /> <br />Provide a back-up power supply for Seibert sewage pump. <br /> <br />Issue Statement There are frequent power interruptions in Seibert, and when they occur the sewage pumps stop working and back- <br />up into homes and businesses in the southern part of Seibert. The pump is west of Seibert on the north side of Highway 24. <br /> <br />Action Item #7 <br /> <br />Works <br /> <br />c <br /> <br />Implementation Manager and strategy: Town of Seibert Publi <br /> <br />Priority: High <br /> <br />HP pump and solar panel to keep the battery charged <br /> <br />to run a 35 <br /> <br />eliminate future damages <br /> <br />90 <br /> <br />Need a backup battery <br /> <br />will <br /> <br />The cost <br /> <br />Unknown at the time <br /> <br />Explanation <br /> <br />Cost- Effectiveness <br /> <br />Cost Estimate <br />