Laserfiche WebLink
<br />Page 3 of 5 <br /> <br />Issue Date: <br /> <br />o 5 2004 <br /> <br />Effective Date: SEP 0 <br /> <br /> <br />Case No.: 04-08-0145P <br /> <br />LOMR-APP <br /> <br /> <br />Federal Emergency Management Agency <br />Washington, D.C. 20472 <br /> <br />LETTER OF MAP REVISION <br />DETERMINATION DOCUMENT (CONTINUED) <br /> <br />COMMUNITY INFORMATION <br /> <br />APPLICABLE NFIP REGULATIONS/COMMUNITY OBLIGATION <br /> <br />We have made this determination pursuant to Section 206 of the Flood Disaster Protection Act of 1973 (p.L. 93-234) and in accordance <br />with the National Flood Insurance Act of 1968, as amended (Title XIII of the Housing and Urban Development Act of 1968, <br />P.L. 90-448),42 U.S.C. 4001-4128, and 44 CFR Part 65. Pursuant to Section 1361 of the National Flood Insurance Act of 1968, as <br />amended, communities participating in the NFIP are required to adopt and enforce floodplain management regulations that meet or <br />exceed NFIP criteria. These criteria, including adoption of the FIS report and FIRM, and the modifications made by this LOMR, are the <br />minimum requirements for continued NFIP participation and do not supersede more stringent Statt</Commonwealth or local requirements <br />to which the regulations apply. <br /> <br />We provide the floodway designation to your community as a tool to regulate floodplain development. Therefore, the floodway revision <br />we have described in this letter, while acceptable to us, must also be acceptable to your community and adopted by appropriate <br />community action, as specified in Paragraph 60.3( d) of the NFIP regulations. <br /> <br />COMMUNITY REMINDERS <br /> <br />We based this determination on the I-percent -annual-chance flood discharges computed in the FIS for your community without <br />considering subsequent changes in watershed characteristics that could increase flood discharges. Future development of projects <br />upstream could cause increased flood discharges, which could cause increased flood hazards. A comprehensive restudy of your <br />community's flood hazards would consider the cumulative effects of development on flood discharges subsequent to the publication of <br />the FIS report for your community and could, therefore, establish greater flood hazards in this area. <br /> <br />Your community must regulate all proposed floodplain development and ensure that permits required by Federal and/or <br />State/Commonwealth law have been obtained. State/Commonwealth or community officials, based on knowledge of local conditions and <br />in the interest of safety, may set higher standards for construction or may limit development in floodplain areas. If your <br />State/Commonwealth or community has adopted more restrictive or comprehensive floodplain management criteria, those criteria take <br />precedence over the minimum NFIP requirements. <br /> <br />This determination is based on the flood data presently available. The enclosed documents provide additional information regarding this determination. If <br />you have any questions about this document, please contact the FEMA Map Assistance Center toll free at 1-877-336-2677 (1-877-FEMA MAP) or by letter <br />addressed to the LOMR Depot, 3601 Eisenhower Avenue, Alexandria, VA 22304. Additional information about the NFIP is available on ourwebsite at <br />htto:/Iwww.fema.gov/nfio. <br /> <br />~e~ <br /> <br />Kevin C. Long, CFM, Project Engineer <br />Hazard Identification Section <br />Mitigation Division <br />Emer enc Pre aredness and Res onse Directorate <br /> <br />1 02426D.A040801451 021AC <br />