Laserfiche WebLink
<br />Action: A motion was made by Harold Miskel and seconded by Eric Wilkinson to <br />approve a Arkansas Basin Account Grant Request Application in an amount of <br />up to $75,000 to complete the Fountain Creek Vision Task Force, with approval <br />contingent on successful resolution of the issues addressed in the Water Activity <br />Summary Sheet. The motion was approved unanimously (9-0), <br />Tape 2, Track 4 00:22:44 - 00:28:27 <br />Action: A motion was made by Harold Miskel and seconded by Don Schwindt to <br />approve an Arkansas Basin Account Grant Request Application in an amount of <br />up to $120,000 to complete the Round Mountain Water and Sanitation District- <br />Water System Improvement Project, with approval contingent on successful <br />resolution of the issues in the Water Activity Summary Sheet. The motion was <br />approved unanimously (9-0). <br />Tape 2, Track 4 00:28:27 - 00:41:11 <br />Action: A motion was made by Keith Catlin and seconded by Carl Trick to approve a <br />Gunnison Basin Account Grant Request Application in an amount of up to <br />$35,000 for the Lake San Cristobal Control Outlet Structure Project contingent <br />upon resolution of the issues in the Water Activity Summary Sheet. The motion <br />was approved unanimously (9-0). <br />Tape 2, Track 4 00:41:11 - 00:46:10 <br />Action: A motion was made by Keith Catlin and seconded by John Redifer to approve a <br />Gunnison Basin Account Grant Request Application in an amount of up to <br />$60,000 to complete the Safety and Serviceability Needs Inventory for <br />Reservoirs in the Leroux Creek Drainage Basin, with approval contingent on <br />successful resolution of the issues in the Water Activity Summary Sheet. The <br />motion was approved unanimously (9-0). <br />Tape 2, Track 4 00:46:10 - 00:58:00 <br />Action: A motion was made by Keith Catlin and seconded by Carl Trick to approve a <br />Gunnison Basin Account Grant Request Application in an amount of up to <br />$60,000 to complete the Orchard City Reservoir Project - Final Design, with <br />approval contingent on successful resolution of the issues in the Water Activity <br />Summary Sheet. The motion was approved unanimously (9-0), <br />Tape 2, Track 4 00:58:00 - 01 :01 :50 <br />Action: A motion was made by Don Schwindt and seconded by Eric Wilkinson to <br />approve a Rio Grande Basin Account Grant Request Application in an amount of <br />up to $36,750 to complete the Rio Grande Conservation Enhancement Program - <br />Proposal and Agreement, with approval contingent on successful resolution of <br />the issues in the Water Activity Summary Sheet. The motion was approved <br />unanimously (9-0). <br />Tape 2, Track 4 01:01:50 - 01:05:00 <br />Action: A motion was made by Eric Wilkinson and seconded by Carl Trick to approve a <br />South Platte Basin Account Grant Request Application in an amount of up to <br />$52,000 to complete the Clear Creek County Water Bank - High Altitude <br />Storage Project, with approval contingent on successful resolution of the issues in <br />the Water Activity Summary Sheet. The motion was approved unanimously (9- <br />0). <br />Tape 2, Track 4 01:05:00 - 02:10:10 <br />Action: A motion was made by Harold Miskel and seconded by Carl Trick to amend the <br />criteria and guidelines for the grant application process for the Water Supply <br /> <br />Flood Protection. Water Supply Planning and Finance. Stream and Lake Protection <br />Water Supply Protection. Conservation and Drought Planning <br />9 <br />