My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
22
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:14 PM
Creation date
8/9/2007 8:49:58 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
IWMD Section - Colorado's Future Water Supply Needs - Update on Consumptive and Non-Consumptive Workgroups
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The roles and responsibilities of the Basin Roundtables, NCNA Workgroup, DNR/CWCB/T echnical Contractor, and NCNA <br />Workgroup Steering Committee are shown in the following figure, The Basin Roundtables will be completing their needs <br />assessment updates by the end of 2008 with assistance from DNR, CWCB and the Technical Contractor The NCNA <br />workgroup will support the Basin Roundtables in completing their needs assessments and will provide a technical forum to <br />discuss common technical platform and consistency across basins, The NCNA Steering committee will work with DNR, <br />CWCB and the Technical Contractor to assist with agenda development, reviewing work products, and provide technical <br />oversight to the process, <br /> <br />~ Complete Needs <br />B R T S Assessments by <br />end of 2008 <br /> <br />L <br /> <br />DN R/CWC <br />CDOWan <br />Technica <br />Contract <br /> <br /> <br />Assists Basin <br />Roundtables in <br />completing their needs <br />assessments <br /> <br />L <br /> <br />- --I <br />NCNA <br />Steering <br />Committe <br /> <br />Subset of NCNA Work Group <br />that Assists with Setti ng <br />Agendas, Reviews Work <br />Products and Provides <br />Technical Oversightto Process <br /> <br />.. <br />NCNA <br />Work <br />Group <br /> <br />Work with Roundtables on <br />Completing Non-consumptive <br />Needs Assessments <br /> <br />3, Methodology <br /> <br />The methodology for completing the nonconsumptive needs assessment is shown in the following figure, The methodology <br />focuses on a two step process for evaluating nonconsumptlve needs - prioritization and quantification These steps and <br />their components are described in more detail below. <br /> <br />II> - r EstabliShl <br />w Build U ' I <br />;::: <br />ii: ~ ~ M <br />0 Attrib ! Priorities p <br />ii: L <br />"- <br /> I E <br /> .. M <br /> E <br /> <br />---I <br />Site-Sp <br />-----""- Qua n t if i c -----""- <br />-----,. I (f i n -----,. <br />charaderi <br /> <br />TemPI. 1 <br /> <br />(Coar - <br />Charaderi <br /> <br />3.1. Build Upon Attributes <br />One of the recommendations from the Statewide Water Supply Initiative (SWSI) Phase 2 Prioritize and Quantify <br />Environment and Recreation Technical Roundtable (ER- TRT) was to use the information It generated as a starting point for <br /> <br />"Triag <br />Where <br />WeNe <br />Quantifi <br /> <br /> <br /> <br />:z <br />o <br />;::: <br /><( <br />u <br />u:: <br />;::: <br />:z <br /><( <br />::) <br />a <br /> <br />Page 2 of5 <br /> <br />O:\Rinkt';rM:K\S\VSI\strat~gy n~vist';t1 o IjullO 7 Jt:,'ist:d by BM.uoc <br />
The URL can be used to link to this page
Your browser does not support the video tag.