My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
15a
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
15a
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:35:43 PM
Creation date
8/8/2007 4:04:30 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
CF Section- New Project Loans - Henrylyn Irrigation District - Horse Creek Reservoir and Prospect Reservoir Rehabilitation
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Henrylyn Irrigation District <br />July 11-12, 2007 <br /> <br />Agenda Item 15a <br /> <br />1. Repair outlet conduit by lining the existing steel pipe. <br />2. Patch & repair the inlet and outlet structures. <br />3, Install approximately 1800 lineal feet of toe drains for seepage control. <br />4. Install a Parshall flume in the outlet canal below the dam. <br />5. Re-grade and road base the dam crest. <br /> <br />Total Project Estimate: <br />1. Construction <br />2. Contingency (20%) <br />3, Engineering/Surveying (20%) <br />TOTAL <br /> <br />$1,558,000 <br />312,000 <br />312,000 <br />$2,182,000 <br /> <br />Prospect Reservoir <br /> <br />Construction: <br />1. Repair outlet conduit by lining the existing concrete pipe. <br />2. Patch & repair the inlet and outlet structures. <br />3, Re-grade and road base the dam crest. <br /> <br />Total Project Cost Estimate: <br />1. Construction <br />2, Contingency (25%) <br />3. Engineering/Surveying (25%) <br />TOTAL <br /> <br />$ 147,000 <br />37,000 <br />37,000 <br />$221,000 <br /> <br />Schedule - If the loan is approved by the CWCS, design for Prospect Dam would start in August <br />2007, with submittal to the State Engineer's Office (SED) in October 2007. Construction would start <br />in March 2008 and be completed by May 2008. Design for Horse Creek Dam would start in July <br />2008, with submittal to the SEO in December 2008. Construction would start in September 2008 <br />and be completed by March 2009. <br /> <br />Financial Analvsis <br /> <br />The total estimated cost of the project is $2,403,000. HID qualifies for the agricultural interest rate, <br />and staff is recommending a maximum loan amount of $2,162,700 (90% of the estimated project <br />cost) for 30 years at an interest rate of 2.25%. HID will pay the 10% local share ($240,300) of the <br />project cost from existing reserves. <br /> <br />Table 1 is a summary of the financial aspects of the project. A CWCS Loan of $2,162,700 would <br />have an annual payment of $99,915 (not including the standard 10% reserve requirement) at the <br />loan terms of 2,25% for 30 years, HID will establish and maintain a loan reserve fund of $99,915 <br />for the loan from their existing reserves. The CWCS loan would be repaid from increases in the <br />assessment levy, as necessary, from $18.00 per acre to a minimum of $21.00 per acre. The <br />annual loan cost to HID for the project will be $7.21 per acre-foot based on the annual delivery of <br />13,850 acre-feet from the two reservoirs, <br /> <br />Project Cost $2,403,000 <br />Number of Irrigators (HID) 350 <br />Number of Acres Assessed (HID) 32,745 <br />CWCS Loan Amount $2,162,700 <br />CWCS Loan Payment (does not include a 10% reserve) $99,915 <br /> <br />Table 1. Financial Summary <br /> <br />Page 4 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.