My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:37 PM
Creation date
8/8/2007 3:03:30 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
IWMD Section - Water Supply Reserve Account July 2007 Grant Allocations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br /> <br />Form Revised October 2006 <br /> <br />. <br /> <br />7. <br /> <br />Water Availability and Sustainability - this information is needed to assess the viability and effectiveness of <br />the water project or activity. Please provide a description of each water supply source to be utilized for, or the <br />water body to be affected by, the water activity. For water supply sources being utilized, describe its location, <br />yield, extent of development, and water right status. For water bodies being affected, describe its location, <br />extent of development, and the expected effect of the water activity on the water body, in either case, the <br />analysis should take into consideration a reasonable range of hydrologic variation. Attach additional sheets as <br />needed. <br /> <br />The Mancos Water Conservancy District has filed on a 2nd filling for Jackson Gulch Reservoir in <br />an amount of2,OOO a-fto be diverted from the Mancos River, of which the Division 7 Water <br />Court has made absolute 1,385 a-fwith the remaining 615 a-fbeing conditional in a decree dated <br />December 31, 1991. The fu112,OOO a-fwas stored in the fall of2006. <br /> <br />Water for the Lake Mancos Dam in the borrow area will be diverted from the Mancos River and <br />transported to the new reservoir through the existing inlet canal and the Crystal Creek Ditch. <br />Outlet of this new dam will drain directly into Jackson Gulch reservoir. The second filling right <br />will be expanded to include storage in the new reservoir. <br /> <br />The Mancos River watershed is believed to be capable of yielding the additiona12,OOO a-f of <br />water to be stored in most years. The cost effectiveness ofthe Expansion Project will be <br />detennined once the feasibility studies are completed. <br /> <br />. <br /> <br />8. If you have not specifically and fully addressed the Evaluation Criteria found in Part 3 of the criteria and <br />guidance document please provide additional detail here. Attach additional sheet(s) if needed. <br /> <br />See Attached Checklist of Evaluation Criteria <br /> <br />l <br /> <br />. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.