My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07
CWCB
>
Chatfield Mitigation
>
Board Meetings
>
DayForward
>
1-1000
>
07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:33:37 PM
Creation date
8/8/2007 3:03:30 PM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
7/11/2007
Description
IWMD Section - Water Supply Reserve Account July 2007 Grant Allocations
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Water Supply Reserve Account - Grant Application Form <br /> <br />Form Revised October 2006 <br /> <br />. <br /> <br />3. <br /> <br />Please provide an overview of water project or activity to be funded including - type of activity, <br />statement of what the activity is intended to accomplish, the need for the activity, the problems and <br />opportunities to be addressed, expectations of the participants, why the activity is important, the service <br />area or geographic location, and any relevant issues etc. Please include any relevant Tabor issues. Please <br />refer to Part 2 of criteria and guidance document for additional detail on information to include. Attach <br />additional sheets as needed. <br /> <br />The study is needed in order to look at expanding the Jackson Gulch Dam and new storage <br />possibilities in the barrow pit. The Mancos Valley is in need of additional storage of approximately <br />2,000 acre teet of water in order to provide for future water needs. The Jackson Gulch Reservoir <br />Expansion Project consists of 2 components. <br /> <br />1) Jackson Gulch Dam. ($80,000) (from the Basin Account) <br />a. The funds will be used to provide a feasibility study for raising the existing Dam for <br />additional storage. <br /> <br />2) Lake Mancos Dam. ($38,000) = ($20,000 + $18,000) <br />a. The funds will be used to provide a feasibility study tor a new Lake Mancos Dam, <br />Reservoir and Canals at the borrow area created in the original construction. <br />b. This application asks for $20.000 (53%) from the Statewide Account. <br />c. With the remaining $18,000 (47%) from in-kind contributions. <br /> <br />. <br /> <br />See Attached. <br /> <br />. <br /> <br />Section 3 attachment <br /> <br />. <br /> <br />Project Management Plan - Small Project, Dated: 9/7/06. <br /> <br />. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.