My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12680
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12680
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:25 PM
Creation date
8/7/2007 12:09:48 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.J
Description
Water Projects - Other Projects - Hoover-Meade-Boulder - Other Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
12/4/1998
Author
AZ - CO - NV - NM - UT - WO
Title
Proposal for Interim Lake Meade Reservoir Operation Criteria Related to Surplus-Normal-and Shortage Year Declarations - Interim Report-Supplement - 12-04-98
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />.. . <br /> <br />002237 <br /> <br />unfair to Arizona and Nevada to adopt interim criteria without developing in parallel an <br />understanding of how shortages on the river will be managed. The existence of water shortage <br />management criteria is essential if those states are to adequately analyze the increased risks they <br />would face from the interim surplus criteria. <br />5.) The United States and the Colorado River Basin States must commit to ongoing <br />studies and analysis to examine whether the interim surplus operating criteria are causing an <br />increased risk of water shortages to Arizona and Nevada. In this process, all parties must reach a <br />mutual understanding of how increased risk will be measured. <br />6.) California must agree to mitigate any increased risk of shortage to Arizona and <br />Nevada. That mitigation might be accomplished through several techniques including a waiver by <br />California of the shortage protection it is afforded by 43 U.S. C. ~ 1521 (b )or, by California <br />agreeing to store in Arizona through the excess capacity available to the Arizona Water Banking <br />Authority, water that could be used to compensate Arizona and Nevada for any increased water <br />shortages they suffer due to the interim operating criteria. Impacts of this interim criteria on the <br />Upper Basin States would be minimized by measures such as the establishment of interim 602 <br />(a) storage criteria or through other mutually agreed-upon measures. <br />7.) Interim operating criteria provisions that would provide extra municipal and <br />industrial water for California during that state's reduction in water use transition period must be <br />designed to provide only that amount of water that is needed by California M&I users after other <br />sources currently available to the state have been used. <br />The Metropolitan Water District of Southern California ("MWD") holds California <br />priority 4 and 5 rights under the Seven Party Agreement to a total of 1.212 maf. The Six States <br />believe that if this volume of water can be provided, the California 4.4 Plan's goal of keeping <br />MWD's Colorado River Aqueduct "essentially full" will be satisfied. <br />The Six States believe that the volume of surplus water to tie made available to MWD <br />must first take into account water unused by higher priority users within California. The Draft 4.4 <br />Plan sets forth a schedule which phases down California's overall de~and for water as <br />conservation measures are being implemented. What the Draft 4.4 Plan does not indicate is the <br />amount of unused water that may be available from more senior water uses (present perfected <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.