My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12661
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12661
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:21 PM
Creation date
8/7/2007 10:14:33 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8282.300
Description
Colorado River Operations and Accounting - Lower Basin Administrative Procedures
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
5/16/1997
Author
DOI-BOR
Title
FWS Final Biological and Conference Opinion on Lower Colorado River Operations and Maintenance - Lake Mead to Southerly International Border - Draft for Review - 05-16-97
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />OJ2972 <br /> <br />BIOLOGICAL OPINION <br /> <br />Proposed Action <br /> <br /> <br />Reclamation actions involving projects in the planning or implementation phase or that are <br />mitigation for past projects may require additional section 7 consultation to address site-specific <br />issues. Other activities not expressly included in the following description of the proposed action <br />are not covered under this consultation, such as, but not limited to, changes in criteria for <br />developing Annual Operating Plans or for declaring water surpluses (beyond the parameters in the <br />description of the proposed action, below), new water contracts, new power production or <br />transmission facilities, and changes in flood control regulations by the Army Corps of Engineers. <br /> <br />Actions <br /> <br />1. Flood control <br /> <br />Flood control operations have the first priority on the LCR as mandated by the Boulder Canyon <br />Project Act. Section 7 of the Flood Control Act of 1944 established that the Secretary of War <br />(now the Army Corps of Engineers [COE]) will prescribe regulations for flood control for projects <br />authorized by that Act. The COE is responsible for developing the flood control operation plan for <br />Hoover Dam and Lake Mead as indicated in 43 CFR 208.11. The plan is the result of a <br />coordinated effort by the COE and Reclamation, but the COE is responsible for providing the flood <br />control regulations and has authority for fmal approval. Any deviations from the flood control <br />operating instructions must be authorized by the COE. The Secretary is responsible for operating <br />Hoover Dam in accordance with these regulations; therefore, Reclamation has only limited <br />discretion in managing Lake Mead elevations for flood control. <br /> <br />Flood control regulations promulgated by the COE for Lake Mead were established to deal with <br />two distinct types of flooding: rain and snowmelt. Snowmelt constitutes about 70 percent of the <br />annual runoff of the Colorado River into Lake Mead. Lake Mead's uppermost 1.5 maf of storage <br />capacity, between elevations 1219.6 and 1229.0 mean sea level (msl), is allocated exclusively to <br />control floods from rain events. Within this capacity allocation, 1.218 maf of flood storage is <br />above elevation 1221.4, which is the top of the raised spillway gates. <br /> <br />Flood control regulations specify that once flood releases exceed 40,000 cubic feet per second <br />(cfs), the releases shall be maintained at the highest rate until the reservoir drops to elevation <br />1221.4. Releases may then be gradually reduced to 40,000 cfs until the prescribed seasonal storage <br />space is available. The flood control regulations set forth two primary criteria to deal with <br />snowmelt: 1) preparatory reservoir space requirements, and 2) application of runoff forecasts to <br />determine releases. <br /> <br />In preparation for the coming year's season of snow accumulation and associated runoff, <br />progressive expansion of total Colorado River system reservoir space is required during the latter <br /> <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.