My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSPC12622
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSPC12622
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:13 PM
Creation date
8/6/2007 3:10:35 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8278.100
Description
River - Salinity-Title I - Yuma Desalter
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/11/2003
Author
Unknown
Title
Modifications to Projects of Title I of the Colorado River Basin Salinity Control Act - Report to Congress by the Secretary of the Interior - Draft - With Staff Comments and Correspondence - 02-11-03
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />000289 <br /> <br />Draft (2/11/03) <br /> <br />Report to the Congress <br />By the Secretary of the Interior <br /> <br />Modifications to Projects of <br />Title 1 of the Colorado River Basin Salinity Control Act <br />(Public Law 93-320, As Amended, 43 U.S.C. 9 1571) <br /> <br />Table of Contents <br /> <br />Secretarial Transmittal Letter 1 <br /> <br />Table of Contents 7 <br /> <br />Introduction 9 <br /> <br />Proj ect Setting 11 <br />Title I of the Act 11 <br />Requirements Under Minute 242 11 <br />Wellton-Mohawk Division Drainage Reduction Measures 12 <br />Colorado River Water Supplies And Needs 13 <br />Emergence Of Environmental Considerations Associated <br />With The Bypass Drain Flow 14 <br />Cost Of Operating And Maintaining Yuma Desalting Plant 15 <br />Use Of Other Measures To Accomplish Title I Objectives 16 <br /> <br />Potential Sources Of Replacement Water To Meet Title I Objectives 17 <br />Forbearance Agreements 17 <br />Non-system Supplies From Groundwater And Other Sources 17 <br />Investing In Advanced Irrigation Techniques To Reduce Use 18 <br />Environmental Considerations 18 <br />Institutional Considerations 18 <br /> <br />Comparative Analvsis Of Operating The Yuma Desalting <br />Plant Versus Implementing Replacement Measures 19 <br /> <br />Other Alternatives Considered 20 <br />Conveying WMIDD For Discharge At Imperial Dam 20 <br />Weather Modification 21 <br /> <br />Consultation With Affected And Interested Parties 21 <br /> <br />Actions To Be Taken After Congressional Waiting Period 22 <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.