Laserfiche WebLink
<br />'=' <br />Q <br />Q <br />N <br />c.n <br />00 <br /> <br />Prima,ry measure - Replace portion of the bypass <br />thus reducing the potential build up of National Obligation, <br />buy time to develop a longer term solution. <br /> <br />Focus - upon recovery of Yuma Valley groundwater, <br />- causing high water table problems, <br />- could be recovered, conveyed and discharged through the <br />Yuma Conduit, above NIB. <br /> <br />Temporary and partial replacement <br />Address need to start replacing the bypass <br />Reduces high water table problems in the Yuma area. <br /> <br />Provide -a full opportunity to question the' experts, <br />and appreciate the details of the plan. <br />