<br />c
<br />o
<br />tv
<br />t"0
<br />~
<br />u:;
<br />
<br />-------/
<br />
<br />!
<br />
<br />~
<br />
<br />Volume on May 1st I Volume on May 1st r::~\ Volume on May 1st
<br />required to fill Ta. ylor I t.o fill Blue Mesa Reservoir required to fill Silver
<br />Park Res. From 24- Mo \ From 24-Month Study. Jack Reservoir
<br />Live Capacity = 106,200 \. Live Capacity = 829,523 AF Live Capacity = 12,820
<br />\
<br />'In future this may increase by and other senior reservoirs
<br />~Iume required to satisfy 'above ISF reach
<br />ASpinall contract demand
<br />M~ Con Demand = 240,000 AF
<br />1/2!Con Demand = 120,000 AF
<br />1/4/Con Demand = 60.000 AF
<br />
<br />----...---...--.
<br />
<br />Date
<br />
<br />May 1 M-J Unregulated
<br />Inflow to Blue Mesa
<br />from 24-Month StUdy
<br />
<br />May 1 M-J Unregulated
<br />Side Inflow upstream
<br />of Crystal dam
<br />from 24-month Study
<br />
<br />M-J Volume on May 1 st
<br />required to Satisfy
<br />Gunnison Tunnel Demand
<br />from 24-Mo. Study
<br />Capacity = 200,730 AF
<br />Max. Diverted = 182,530
<br />
<br />M-J Volume on May 1 st
<br />required to Satisfy
<br />60,000 AF subord. Demand
<br />not incorporated in
<br />unregulated inflow
<br />
<br />M-J Volume on May 1 st
<br />Required to meet
<br />300 cfs min flow
<br />Max = 54,745
<br />Assumes this is senior
<br />to Blue Mesa
<br />
<br />M-J Volume available Est M-J Volume in
<br />on May 1 st to create in Canyon as of
<br />spring peak May 1 st
<br />
<br />. May-99
<br />
<br />549,000 155,000 46,200 293,523
<br />549,000 155,000 46,200 413,523
<br />549,000 155,000 46,200 353,523
<br /> ... -.
<br />682,000 124,000 56,200 329,523
<br />682,000 124,000 56,200 449,523
<br />
<br />10,000 180,000 8,200
<br />10,000 180,000 60,000
<br />10,000 180,000 60,000
<br />10,000 180,000 8,200
<br />10,000 180,000 60,000
<br />
<br />54,745 111,332 166,077 161.800
<br />54,745 (60,468) 54,745
<br />54,745 (468) 54,745
<br />54,745 167,332 222,077
<br />54,745 (4,468) 54,745
<br />54,745 371,332 426,077 !
<br />54,745 199,532 254,277
<br /> ~* ""..
<br /> .-
<br />
<br />!
<br />i\
<br />J
<br />
<br />I
<br />!
<br />329,523
<br />--'-A49,523 i
<br />~_J
<br />
<br />1. If the contract deliveries come directly out of 1st fill, then the reservoir levels are reduced and there is no shortage to the canyon.
<br />2, If the contract deliveries are satisfied and the 2nd fill for Blue Mesa is used then the Canyon flows are reduced by the contract amounts taken during the May-July period as shown,
<br />3, I have used the full 60,000 AF subordination amount during the May-July period as the worst case, obviously it will be something less.
<br />
<br />Average
<br />
<br />Upper Quartile
<br />
<br />855,000
<br />855,000
<br />
<br />155,000
<br />155,000
<br />
<br />56,200
<br />56,200
<br />
<br />10,000
<br />10,000
<br />
<br />180,000
<br />180,000
<br />
<br />8,200
<br />60,000
<br />
<br />Notes:
<br />
|