Laserfiche WebLink
<br />c <br />o <br />tv <br />t"0 <br />~ <br />u:; <br /> <br />-------/ <br /> <br />! <br /> <br />~ <br /> <br />Volume on May 1st I Volume on May 1st r::~\ Volume on May 1st <br />required to fill Ta. ylor I t.o fill Blue Mesa Reservoir required to fill Silver <br />Park Res. From 24- Mo \ From 24-Month Study. Jack Reservoir <br />Live Capacity = 106,200 \. Live Capacity = 829,523 AF Live Capacity = 12,820 <br />\ <br />'In future this may increase by and other senior reservoirs <br />~Iume required to satisfy 'above ISF reach <br />ASpinall contract demand <br />M~ Con Demand = 240,000 AF <br />1/2!Con Demand = 120,000 AF <br />1/4/Con Demand = 60.000 AF <br /> <br />----...---...--. <br /> <br />Date <br /> <br />May 1 M-J Unregulated <br />Inflow to Blue Mesa <br />from 24-Month StUdy <br /> <br />May 1 M-J Unregulated <br />Side Inflow upstream <br />of Crystal dam <br />from 24-month Study <br /> <br />M-J Volume on May 1 st <br />required to Satisfy <br />Gunnison Tunnel Demand <br />from 24-Mo. Study <br />Capacity = 200,730 AF <br />Max. Diverted = 182,530 <br /> <br />M-J Volume on May 1 st <br />required to Satisfy <br />60,000 AF subord. Demand <br />not incorporated in <br />unregulated inflow <br /> <br />M-J Volume on May 1 st <br />Required to meet <br />300 cfs min flow <br />Max = 54,745 <br />Assumes this is senior <br />to Blue Mesa <br /> <br />M-J Volume available Est M-J Volume in <br />on May 1 st to create in Canyon as of <br />spring peak May 1 st <br /> <br />. May-99 <br /> <br />549,000 155,000 46,200 293,523 <br />549,000 155,000 46,200 413,523 <br />549,000 155,000 46,200 353,523 <br /> ... -. <br />682,000 124,000 56,200 329,523 <br />682,000 124,000 56,200 449,523 <br /> <br />10,000 180,000 8,200 <br />10,000 180,000 60,000 <br />10,000 180,000 60,000 <br />10,000 180,000 8,200 <br />10,000 180,000 60,000 <br /> <br />54,745 111,332 166,077 161.800 <br />54,745 (60,468) 54,745 <br />54,745 (468) 54,745 <br />54,745 167,332 222,077 <br />54,745 (4,468) 54,745 <br />54,745 371,332 426,077 ! <br />54,745 199,532 254,277 <br /> ~* "".. <br /> .- <br /> <br />! <br />i\ <br />J <br /> <br />I <br />! <br />329,523 <br />--'-A49,523 i <br />~_J <br /> <br />1. If the contract deliveries come directly out of 1st fill, then the reservoir levels are reduced and there is no shortage to the canyon. <br />2, If the contract deliveries are satisfied and the 2nd fill for Blue Mesa is used then the Canyon flows are reduced by the contract amounts taken during the May-July period as shown, <br />3, I have used the full 60,000 AF subordination amount during the May-July period as the worst case, obviously it will be something less. <br /> <br />Average <br /> <br />Upper Quartile <br /> <br />855,000 <br />855,000 <br /> <br />155,000 <br />155,000 <br /> <br />56,200 <br />56,200 <br /> <br />10,000 <br />10,000 <br /> <br />180,000 <br />180,000 <br /> <br />8,200 <br />60,000 <br /> <br />Notes: <br />