My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP12643
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP12643
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 4:17:07 PM
Creation date
8/6/2007 1:40:37 PM
Metadata
Fields
Template:
Water Supply Protection
File Number
8142.700
Description
Arkansas River - Trinidad Project - Operating Plans-Reports
State
CO
Basin
Arkansas
Water Division
2
Date
11/26/1997
Author
Purgatoire River Hydrologic Unit
Title
Demonstration of Improved Irrigation Practices to Promote Water Management and Conservation - Purgatoire River Hydrologic Unit - 11-26-97
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001444 <br /> <br />DEMONSTRATION OF IMPROVED IRRIGATION PRACTICES <br />PURGATOIRE RIVER HYDROLOGIC UNIT <br /> <br />The Spanish Peaks-Purgatoire River Soil has assisted three individual <br />farmers with projects during 1997. Following is a summary of each project <br /> <br />Irri~ation Pipeline Installation for Charles Gvurman <br /> <br />Pipe, fitings, labor and ins~allation <br />1140' of 15" buried pipe <br />1260' of 12" gated pipe <br /> <br />10,481.15 <br /> <br />Additional expenses and administration costs, SCD, <br />extension and landowner <br /> <br />3.145.00 <br /> <br />Total project <br /> <br />60~ paid to Charles Gyurman <br /> <br />$13,626.15 <br />S 8,175.69 <br /> <br />Water Control Structure for Charles Gyurman <br /> <br />Labor and materials <br /> <br />$1,475.00 <br /> <br />60% paid to Charles Gyurman <br /> <br />$ 885.00 <br /> <br />Tail Water Recovery Pit & Land Levelin2 for Rov Morris <br /> <br />Tail Water Pit <br />Land Leveling (25 ac.) <br /> <br />2,408 cu. yd. <br />4,638 cu. yd. <br /> <br />2,408.00 <br />4,638.00 <br /> <br />Additional expenses and administration costs, SCD, <br />extension, and landowner <br /> <br />1.815.00 <br /> <br />Total Project <br /> <br />$8,861.00 <br /> <br />60% paid to Roy Morris <br /> <br />$5,326.60 <br /> <br />Irri2ation Pipeline for Rov Morris <br />, <br /> <br />Labor and Materials (1,51S ft.) <br /> <br />$6,326.11 <br /> <br />60% paid to Roy Morris <br /> <br />$3,795.67 <br /> <br />Land Leveling for Tom Miller <br /> <br />Total cubic yards moved - 17,233 cu. yd. @ SO.60 <br />Acres - 13.3 <br /> <br />$10,339.80 <br /> <br />60% paid to Tom Miller <br /> <br />$ 6,ZQ3.8S <br />
The URL can be used to link to this page
Your browser does not support the video tag.