My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Longmont_WCPlan_ApprvlLtr
CWCB
>
Water Efficiency Grants
>
Day Forward
>
Longmont_WCPlan_ApprvlLtr
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/17/2011 9:31:46 AM
Creation date
8/3/2007 3:42:05 PM
Metadata
Fields
Template:
Water Efficiency Grants
Water Efficiency Grant Type
Water Conservation Planning Grant
Contract/PO #
OE PDA 08-15
Applicant
City of Longmont
Project Name
City of Longmont Water Conservation Plan
Title
Grant Application for City of Longmont
Date
7/19/2007
County
Boulder
Water Efficiency - Doc Type
Approval Letter
Document Relationships
Longmont WC Plan 2008
(Message)
Path:
\Water Conservation\DayForward
Longmont_WCPlan_Invoices
(Message)
Path:
\Water Efficiency Grants\Day Forward
Longmont_WCPlan_PO
(Message)
Path:
\Water Efficiency Grants\Day Forward
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />;; <br /> <br />Step 2 - Characterize Water Use and Demand Forecast <br /> <br />Purpose <br />The activities described under this task will provide information on the City's existing and <br />projected water use. <br /> <br />Tasks <br />2.1 Characterize current water use - in coordination with the City's public works and <br />finance departments, review sales records, production and treatment records and billing <br />records to summarize water use by segment. Included in the discussion will be <br />estimations of indoor and outdoor water use and potable and non-potable water use. <br /> <br />2.2 Select forecasting method - A demand forecasting method will be selected and <br />described. <br /> <br />2.3 J?repare demand forecast - estimate future water demand by segment or customer class. <br />Worksheet 2-1 will be used as a guide. <br /> <br />Step 3 - Profile Proposed Facilities <br /> <br />Purpose <br />The activities described under this task will provide information on the City's facility needs. <br />Note that the City has recently completed a new water treatment plant which provides <br />capacity to expected build-out. Therefore, facility costs are not expected to be a key driver <br />in the planning process. The expanded use of raw water for landscape irrigation is expected <br />to be a key planning issue, since increased use of raw water provides additional imstream <br />flow within areas with critical and/ or important habitat. <br /> <br />Tasks <br />3.1 Identify and cost potential facility needs - identify and describe options to improve and <br />add capacity to the existing raw water system to meet the water demands outlined in <br />Step 2. Worksheet 3-1 will be used as a guide for this subtask. <br /> <br />Step 4 - Identify Conservation Goals <br /> <br />Pu~pose <br />The activities described under this task will identify conservation goals for the City. <br /> <br />Tasks <br />4.1 Identify purpose for water conservation savings - including use of saved water to <br />support growth, improved water supply reliability and improved local instream flows. <br /> <br />4.2 Identify areas of water supply key savings - identify water savings needs and <br />opportunities by water use segment, based on recent growth, conversion of tTeated to <br />raw water use, and expected impacts of measures and programs. <br /> <br />4.3 Develop preliminary water conservation goals - working with City staff, develop water <br />conservation goals. Areas for water conservation will be identified. A specific water <br />savings target, including percentage of water savings, timeframe during which water <br />savings will occur, as well as how the savings will be measured will be identified. <br />
The URL can be used to link to this page
Your browser does not support the video tag.