My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD10410
CWCB
>
Floodplain Documents
>
Backfile
>
10001-11000
>
FLOOD10410
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2009 12:40:59 PM
Creation date
8/2/2007 4:13:49 PM
Metadata
Fields
Template:
Floodplain Documents
County
Denver
Community
Cherry Creek
Stream Name
Cherry Creek
Title
Memo - Meeting Minutes for Cherry Creek Dam Safety Investigation
Date
5/26/1999
Prepared For
Project File
Prepared By
Larry Lang
Floodplain - Doc Type
Project
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Colorado Water Conservation Board <br />Department of Natural Resources <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phone: (303) 866-3441 <br />FAX: (303) 866-4474 <br /> <br />STATE OF COLORl\DO <br /> <br />. <br /> <br />, t. <br /> <br />.' <br />. <br /> <br />MEMORANDUM <br />VIA FAX <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Walcher <br />Executive Director, DNR <br /> <br />Peter H, Evans <br />Director, ewes <br /> <br />To: Don Morrison - Greenwood Village Council Member <br /> <br />Lev <br />From: Larry Lang -Colorado Water Conservation Board 1 <br /> <br />Date: May 20, 1999 <br /> <br />Re: May 21, 1999 Cherry Creek Dam Safety Investigation Meeting <br /> <br />Purpose of Meeting <br />The purpose ofthe meeting is to: <br />· Compile scientific issues/concerns that have been expressed during the Corp's public <br />meetings <br />· Collect historical information regarding past flood events in the region <br />· Gather the public's social and economic issues/concerns regarding Cherry Creek Dam <br />modifications and upstream reservoir proposals <br />· Express ideas for a procedure to inform and involve interested parties in the study <br />· Develop a list of candidates/representatives to serve on a technical review team and steering' <br />committee <br /> <br />Proposed Schedule of Meetings <br />· May 21, 1999 - the CWCB will conduct an informal round table discussion to obtain basic <br />data, local basin issues/concerns, and a proposal to develop a study process <br />· May 27, 1999 - The CWCB will meet with the Corps of Engineers to better understand their <br />existing and future study processes. The Corps will be briefed on the local-state issues and <br />concerns. A procedure will be agreed to for a mid-June meeting for the purpose of scripting <br />a hydrologic study proposal for a PMP and PMF evaluation for the Cherry Creek Basin. <br />· Mid-June Meeting - A meeting will be conducted for the purpose of having recognized <br />meteorological and climatological experts present information for the preparation of a Study <br />Proposal. The local technical review team and steering committee members will be invited <br />to the meeting. <br /> <br />Public Information <br />At our Friday meeting, I will ask for suggestions on means to keep interested parties informed on <br />study activities. These means may include: <br />· Basin newsletters <br />. Workshops <br />· Focus teams <br />· Public meetings <br />· Web site publications L:/wctrans/secaJprojects/Cherry Creek/May 21 meeting memo,doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.